BLD02-00716
| BLD-Footing | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | A | NR |
|
|
###-#### not ready for insp. recall. 5/2/2002 11:12:12 AM
|
BLD02-00716
| BLD-Foundation | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | A | PASS |
|
|
###-#### sam wall ft and pad in bldg for load point ok. 5/3/2002 11:30:50 AM
|
BLD02-00245
| BLD-Framing/Rough-in | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | A | PASS |
|
|
john ###-#### for duplex fr
|
BLD01-02610
| BLD-Other | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/02/2002 at 15:34:06. Contact: ###-####. firewall at north p/l ok/bld ok to stock with wood to access area to proved fire access road. 5/3/2002 9:06:34 AM
|
BLD02-01004
| BLD-Footing | 5/3/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | A | PASS |
|
|
###-#### call first to meet there ft and walls as well as interior pad ft ok for cover/ 5/3/2002 11:34:21 AM
|
BLD01-00654
| BLD-Final | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 05/02/2002 at 16:19:36. Contact: ###-####. out of time. 5/3/2002 5:16:49 PM
|
BLD01-00653
| BLD-Final | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/02/2002 at 16:20:34. Contact: ###-####. final ok 5/3/2002 5:11:38 PM
|
MIS02-00113
| BLD-Final | 5/1/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | P | PASS |
|
|
CHARLENE E MC CARLEY ###-#### have explained to the homeowner that the PM is a 4 hour window.
**Please make a note for the inspector to leave the inspection with the homeowner or drop off at 1025 S Capitol Blvd.
form on site. 5/3/2002 6:04:10 PM
|
BLD02-00753
| BLD-Framing/Rough-in | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 05/02/2002 at 15:29:53. Contact: ###-####. out of time 5/3/2002 5:16:37 PM
|
BLD01-02848
| BLD-Wall cover | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | P | FAIL |
|
|
###-#### LES 2 hr wall /rain leader/seam lap and screw sch./box and fire shuder in loby corridor. 5/3/2002 4:42:58 PM
|
BLD01-03200
| BLD-Framing/Rough-in | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/02/2002 at 11:39:33. Contact: . restaroom ok 5/3/2002 3:03:09 PM
|
BLD02-00753
| BLD-Framing/Rough-in | 5/2/2002 | 5/3/2002 | 5/2/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 05/02/2002 at 14:19:34. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 05/02/2002 at 15:24:32.
|
BLD02-00753
| BLD-Framing/Rough-in | 5/2/2002 | 5/3/2002 | 5/2/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 05/02/2002 at 15:28:02. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 05/02/2002 at 15:28:54.
|