Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-01214 Water and/or Sewer5/2/20025/3/20025/3/2002 12:00:00 AMAPASS
sewer only ###-#### bob
PLM02-00181 Plumbing Rough-in5/2/20025/3/20025/3/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 05/02/2002 at 14:18:55. Contact: ###-####. Change 2 inch san ts on drain lines from lavs to 3by 2 san ts with 3 inch clean outs. 5/3/2002 2:33:29 PM
PLM02-00181 Roof Drains5/2/20025/3/20025/3/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/02/2002 at 14:19:28. Contact: ###-####.
PLM02-01218 Plumbing Rough-in5/2/20025/3/20025/3/2002 12:00:00 AMAPASS
###-####
PLM02-01213 Plumbing Rough-in5/2/20025/3/20025/3/2002 12:00:00 AMAFAIL
ron ###-#### r/i called Bob Archibald and informed of plumbing work, sewer and water on site that looked like several stub ups similar to what you would see for a motor or moble home park and a 5 foot high solid board fence around the entire area. Called Annett and she could only find a demo structural permit. Called ron at Boise Valley Pump and told him not to backfill water line from well till further notice. 5/3/2002 10:59:53 AM
PLM02-01055 Plumbing Rough-in5/3/20025/3/20025/3/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 05/03/2002 at 09:53:49. Contact: ###-####.