PLM02-01214
| Water and/or Sewer | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | A | PASS |
|
|
sewer only ###-#### bob
|
PLM02-00181
| Plumbing Rough-in | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/02/2002 at 14:18:55. Contact: ###-####. Change 2 inch san ts on drain lines from lavs to 3by 2 san ts with 3 inch clean outs. 5/3/2002 2:33:29 PM
|
PLM02-00181
| Roof Drains | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/02/2002 at 14:19:28. Contact: ###-####.
|
PLM02-01218
| Plumbing Rough-in | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-01213
| Plumbing Rough-in | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | A | FAIL |
|
|
ron ###-#### r/i called Bob Archibald and informed of plumbing work, sewer and water on site that looked like several stub ups similar to what you would see for a motor or moble home park and a 5 foot high solid board fence around the entire area. Called Annett and she could only find a demo structural permit. Called ron at Boise Valley Pump and told him not to backfill water line from well till further notice. 5/3/2002 10:59:53 AM
|
PLM02-01055
| Plumbing Rough-in | 5/3/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/03/2002 at 09:53:49. Contact: ###-####.
|