ELE02-01313
| Electrical Rough-In | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | A | PASS |
|
|
r/i ron ###-#### ok trench, tld to put 4" sand in 5/3/2002 9:22:09 AM
|
ELE01-02676
| Electrical Rough-In | 5/3/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/03/2002 at 07:28:58. Contact: ###-####.
|
ELE02-01122
| Electrical Rough-In | 5/3/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | P | PASS |
|
|
###-#### KELLY 3RD FLOOR SE CORNER rest of r/i 5/3/2002 2:12:33 PM
|
ELE02-01303
| Final | 5/3/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | P | PASS |
|
|
###-#### marv p/s o/h rec - ok 5/3/2002 2:28:21 PM
|
ELE02-01090
| Permanent Service | 5/3/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/03/2002 at 10:09:17. Contact: ###-####. told to repull conductors or meg out conductors to sub-panels, and entire length of conductor has to bee in lugs. 5/3/2002 2:37:36 PM
|