PLM02-01207
| Groundwork | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 360 On 5/2/2002 6:00:25 PM
|
PLM02-01208
| Sprinkler (Final) | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | A | PASS |
|
|
BACKFLOW ###-#### ROBERT
|
PLM01-02891
| Final | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/02/2002 at 08:53:41. Contact: ###-####. final on nort west corner class room sink ok 5/3/2002 10:19:43 AM
|
PLM02-01177
| Plumbing Rough-in | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/02/2002 at 12:04:37. Contact: ###-####.
|
PLM02-01217
| Sprinkler (Final) | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | A | PASS |
|
|
###-#### WES
|
PLM02-01220
| Water and/or Sewer | 5/2/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | P | NR |
|
|
###-#### water line 5/3/2002 3:24:44 PM not ready to test told contractor it was ok to cover pipe between connection but not to cover connection, until after test and inspection 5/3/2002 3:27:55 PM
|
PLM02-01070
| Final | 5/3/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | P | PASS |
|
|
fn karen -###-####
|
PLM02-01089
| Final | 5/3/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | P | PASS |
|
|
###-#### MARION
|
PLM02-01223
| Sprinkler (Final) | 5/3/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM02-01224
| Plumbing Rough-in | 5/3/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | P | PASS |
|
|
r/i joe ###-####
|
PLM02-01139
| Final | 5/3/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | P | PASS |
|
|
###-#### rick
|
PLM02-00672
| Final | 5/3/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 360 On 5/3/2002 1:03:23 PM have double check for sprinkler retested and certified need hose bibb type vacuum breaker for out side yard hydrant oked temp.called plumbingcontractor 5/3/2002 2:58:42 PM
|
PLM02-01222
| Water and/or Sewer | 5/3/2002 | 5/3/2002 | 5/3/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 360 On 5/3/2002 4:52:45 PM
|