Inspections for the day of: Friday, May 3, 2002.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01001 BLD-Framing/Rough-in5/2/20025/3/20025/3/2002 12:00:00 AMAPART
Scheduled by Inspector: 407 On 5/2/2002 4:37:18 PM . went over job with plan reveiw. 5/3/2002 3:20:19 PM
BLD02-00540 BLD-Foundation5/2/20025/3/20025/3/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 05/02/2002 at 17:45:56. Contact: ###-####.
BLD02-01001 BLD-Framing/Rough-in5/3/20025/3/20025/3/2002 12:00:00 AMAFAIL
Scheduled by Inspector: 407 On 5/3/2002 6:41:13 PM The roof straps do not have the correct bolt, needs hilti epoy, also the existing straps need blocking under, called engineer, contractor on site, also talked with framer, The engineer will address a fix. C/n given to contractor.Note prior entry this am was a mistake, should be cancelled this is correct..3/2002 6:45:21 PM 5/3/2002 6:45:52 PM 5/3/2002 6:46:47 PM
BLD00-03208 BLD-Framing/Rough-in5/2/20025/3/20025/3/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 05/02/2002 at 12:53:48. Contact: ###-####.///off of north street 5/2/2002 1:55:28 PM pre-inspection only, will need a complete inspection , noted some areas of work with contractor . 5/3/2002 6:36:06 PM
BLD00-03207 BLD-Framing/Rough-in5/2/20025/3/20025/3/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 05/02/2002 at 12:56:15. Contact: ###-####.///off of north street 5/2/2002 1:54:56 PMpre-inspection only will need to recall . 5/3/2002 6:36:24 PM
BLD00-03204 BLD-Framing/Rough-in5/2/20025/3/20025/3/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 05/02/2002 at 12:57:41. Contact: ###-####.
off of north st 5/2/2002 1:55:51 PMpre-inspection only will need to recall. 5/3/2002 6:36:42 PM
BLD01-02802 BLD-Framing/Rough-in5/2/20025/3/20025/3/2002 12:00:00 AMPPART
Scheduled by Inspector: 407 On 5/2/2002 2:07:28 PM still waiting for eng detail for new conection at top of front of entry ok to start cover 5/3/2002 2:05:19 PM 5/3/2002 2:05:44 PM
MEC01-01687 Final5/3/20025/3/20025/3/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 05/03/2002 at 08:01:41. Contact: ###-####. There is an out door portable bbq with a ducted vent ,thru the roof , at this time there is not a hood and fan assembly. No c/n posted called contractor about vent. Also note:( to next inspector, this house has been furnished and appears to be occupied. With out final bld approval). 5/3/2002 4:43:42 PM
BLD01-02888 BLD-Framing/Rough-in5/3/20025/3/20025/3/2002 12:00:00 AMPCANC
###-#### JUSTIN Unable to do , Had to leave accross town for another inspection. 5/3/2002 6:53:52 PM
BLD01-02612 BLD-Conference5/3/20025/3/20025/3/2002 12:00:00 AMPPART
Scheduled by Inspector: 407 On 5/3/2002 2:49:18 PM went over with plan review. 5/3/2002 4:16:05 PM
BLD01-02224 BLD-Conference5/3/20025/3/20025/3/2002 12:00:00 AMPPART
Scheduled by Inspector: 407 On 5/3/2002 3:16:16 PM . Left a 30 day notice to obtain occupancy. 5/3/2002 3:19:56 PM
BLD01-02612 BLD-Framing/Rough-in5/3/20025/3/20025/3/2002 12:00:00 AMPCANC
Scheduled by Inspector: 407 On 5/3/2002 4:52:25 PM
BLD02-01001 BLD-Framing/Rough-in5/3/20025/3/20025/3/2002 12:00:00 AMPFAIL
Scheduled by Inspector: 407 On 5/3/2002 6:39:40 PM Talked with engineer he has done a field reveiw, the hols hove been drilled and bolts have not been placed, Now I have driven from a job site to verify the placement of these bolts, they are in, but the nut can not be tightened untill the epoxy has dried, I have left a c/n to not cover untillI have re-inspected. The roofer had informed me he was planning on covering these. I called contractor back , and told him this , and when I was leaving rapid resonce was at site i informeed them of the correction I had placed. NOTE: THIS WAS NOT A CALLED IN INSPECTION. 5/3/2002 6:52:35 PM