Inspections for the day of: Friday, May 3, 2002.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02890 BLD-Framing/Rough-in5/2/20025/3/20025/3/2002 12:00:00 AMAFAIL
fr insp -john ###-#### C/N posted. Do not cover--builder insulated prior to approval of frame. Ok to insulate only. 5/3/2002 8:59:31 AM
BLD01-02536 BLD-Other5/2/20025/3/20025/3/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 05/02/2002 at 14:39:18. Contact: ###-####. Suspended ceiling--c/n posted--ok to cover main area and perimeter of others. 5/3/2002 11:49:10 AM
BLD01-02818 BLD-Final5/2/20025/3/20025/3/2002 12:00:00 AMAPASS
###-#### BOB c. of c. #22390 issued. 5/3/2002 8:43:20 AM
BLD02-00406 BLD-Framing/Rough-in5/2/20025/3/20025/3/2002 12:00:00 AMAPASS
SHEER PANEL ###-#### TOM Ok to cover ext. and interior. 5/3/2002 11:49:36 AM
BLD01-02890 BLD-Energy code compliance5/2/20025/3/20025/3/2002 12:00:00 AMANR
berry ###-#### Do not cover 5/3/2002 8:58:33 AM
MEC02-00892 Final5/2/20025/3/20025/3/2002 12:00:00 AMAFAIL
###-#### c/n posted 5/3/2002 11:21:08 AM
MEC02-01169 Pressure Test5/2/20025/3/20025/3/2002 12:00:00 AMPPASS
###-#### Pressure test only 5/3/2002 1:57:00 PM
BLD01-01944 BLD-Footing5/2/20025/3/20025/3/2002 12:00:00 AMPPASS
allen ###-#### ft insp
BLD02-00353 BLD-Framing/Rough-in5/3/20025/3/20025/3/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 05/03/2002 at 07:37:34. Contact: ###-####. Correction n. posted-ok to insulate. 5/3/2002 1:08:58 PM
MEC02-00648 Final5/3/20025/3/20025/3/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 05/03/2002 at 08:23:28. Contact: ###-####. C/N-Pipe protection needed in front of furnace in garage. 5/3/2002 2:53:39 PM
BLD02-00041 BLD-Final5/3/20025/3/20025/3/2002 12:00:00 AMPNH
###-#### STEVE C/N--No access to building to perform inspection. 5/3/2002 2:52:59 PM
BLD02-00578 BLD-Framing/Rough-in5/3/20025/3/20025/3/2002 12:00:00 AMPPART
STEM WALL ###-#### ERIC wip--Not framing--foundational wall 5/3/2002 1:56:35 PM
BLD02-00392 BLD-Final5/3/20025/3/20025/3/2002 12:00:00 AMPNR
###-#### mike occupancy--Contacted home owner--All trades needs finals prior to final occupancy inspection. 5/3/2002 4:11:44 PM
BLD02-00821 BLD-Foundation5/3/20025/3/20025/3/2002 12:00:00 AMPPART
Scheduled by Inspector: 420 On 5/3/2002 11:57:08 AM wip 5/3/2002 4:11:59 PM