BLD04-00367
| BLD-Final | 5/3/2004 | 5/3/2004 | 5/3/2004 11:18:38 AM | P | CANC |
|
|
Timothy; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Inspection cancelled from web by: Aimee Hughes
|
BLD01-01632
| BLD-Aging Inspection | 5/3/2004 | 5/3/2004 | 5/3/2004 12:00:00 AM | | DONE |
|
|
|
MIS01-00231
| MIS-Aging Inspection | 5/3/2004 | 5/3/2004 | 5/3/2004 12:00:00 AM | | DONE |
|
|
|
BLD98-03705
| BLD-Footing | 5/2/2004 | 5/3/2004 | 5/3/2004 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 5/2/2004 at 9:43:38 PM. Contact: ###-####. crew on site preping rebar for backfilling along main crew has removed all wood forms rebar trash ect and placed 3/4 chips up to top off bldg pad and stacked 2x3x4 concrete blocks along main 5/3/2004 10:59:23 AM
|
BLD03-01855
| BLD-Final | 5/3/2004 | 5/3/2004 | 5/3/2004 12:00:00 AM | P | PASS |
|
|
Barney; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok for perm occ 5/3/2004 2:52:18 PM
|
BLD04-00295
| BLD-Framing/Rough-in | 5/3/2004 | 5/3/2004 | 5/3/2004 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 5/3/2004 at 7:31:18 AM. Contact: ###-####. c/n on site 5/4/2004 7:53:10 AM
|
BLD03-02446
| BLD-Energy code compliance | 5/3/2004 | 5/3/2004 | 5/3/2004 12:00:00 AM | P | PASS |
|
|
Don; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD03-03001
| BLD-Framing/Rough-in | 5/3/2004 | 5/3/2004 | 5/3/2004 12:00:00 AM | P | PART |
|
|
bryan; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok to insulate needs fire blocking above fire place main floor and at ceiling line second floor were walls are fured out to make 45s 5/3/2004 2:30:20 PM
|