Inspections for the day of: Wednesday, May 3, 2006.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-00631 BLD-Aging Inspection5/3/20065/3/20065/4/2006 2:57:39 PM NR
I spoke to the secretary and she had me leave a message on Gale's voice mail requesting the status of the job. I also spoke with the warehouse manager Lance about getting the permit finaled.
FIR05-00850 INSP-Supply line flush5/3/20065/3/20065/3/2006 4:15:42 PMPPASS
Underground flush passed. Underground hydro test passed.
FIR06-00239 INSP-Supply line flush5/3/20065/3/20065/3/2006 4:15:07 PMPPASS
Underground flush passed. Underground hydro test passed.
FIR06-00229 INSP-Sprinkler Rough-in/Hydro5/3/20065/3/20065/3/2006 3:28:18 PMPPASS
Above ground hydro test passed. I performed a partial rough-in inspection. The EFSR heads were too close to the truss webbing. Some EQ bracing still needed to be installed.
FIR06-00086 INSP-Sprinkler Rough-in/Hydro5/2/20065/3/20065/3/2006 2:07:10 PMAPASS
Sprinkler piping is ok to cover up to the engine bays. Underground hydro test and flush passed.
FIR06-00086 INSP-Supply line flush5/2/20065/3/20065/3/2006 12:15:59 PMAPASS
Supply line hydro test and flush passed.
FIR06-00229 INSP-Sprinkler Rough-in/Hydro5/3/20065/3/20065/3/2006 12:00:00 AMPCANC
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles wants to rescheduled for 5/4/2006