Inspections for the day of: Tuesday, May 3, 2011.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDaryl DeGrange
TitleELE-INSPECTION SUPV
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE11-00872 Final5/3/20115/3/20115/3/2011 2:10:42 PMPPASS
final ok
ELE11-00872 Electrical Rough-In5/3/20115/3/20115/3/2011 2:10:17 PMPPASS
KEVIN Phone #: ###-#### PLEASE CALL 30 MIN BEFORE GOING OUT SO THAT DOG CAN BE LOCKED UP rough-in ok listed equipment (hot tub)
ELE11-00853 Electrical Rough-In5/3/20115/3/20115/3/2011 1:22:46 PMPPASS
Call for access--Kevin Phone #: ###-#### rough-in ok rear patio lighting
ELE09-01699 ELE-Aging Inspection5/3/20115/3/20115/3/2011 1:04:12 PM DONE
No activity- left card in door for second time.
ELE11-00495 Electrical Rough-In5/3/20115/3/20115/3/2011 12:45:18 PMPPASS
###-#### Clyde rough-in ok first floor
ELE11-00495 Final5/3/20115/3/20115/3/2011 12:31:03 PMPCANC
Clyde Phone #: ###-####
ELE11-00784 Electrical Rough-In5/3/20115/3/20115/3/2011 12:18:38 PMPPASS
Floor heat inspection. Please call Don 1/2 prior to inspection for access. ###-#### >> Inspection requested via web by Terry Scott rough-in ok master bath
ELE09-01879 ELE-Aging Inspection5/3/20115/3/20115/3/2011 10:37:15 AM DONE
still under construction waiting for renter to move out
ELE11-00868 Permanent Service5/2/20115/3/20115/3/2011 10:10:48 AMAPASS
trent Phone #: ###-#### p/s u/g rec ok
ELE11-00433 Final5/2/20115/3/20115/3/2011 9:49:42 AMAPASS
Please inspect 11th floor lobby bathrooms at your leisure. Loren is not on site. Park in loading dock to ease building access. Take freight elevator up. Thanks! Phone #: ###-#### >> Inspection requested via web by Loren Ramsey final ok
ELE11-00431 Final5/2/20115/3/20115/3/2011 9:47:44 AMAPASS
Inspect elevator lobby bathrooms on 9th floor at your leisure. Loren is not on site. Please park in loading dock to ease building access. take frieght elevator up. Phone #: ###-#### >> Inspection requested via web by Loren Ramsey final ok
ELE10-02676 Electrical Rough-In5/3/20115/3/20115/3/2011 9:03:13 AMAPASS
Hard-lid rough inspect on first floor. Contact is Tom Hackman. Phone #: ###-#### >> Inspection requested via web by Richard Montgomery rough-in ok hard lid areas 1st floor
ELE11-00865 Conference5/3/20115/3/20115/3/2011 8:40:54 AMADONE
requested by Daryl De Grange Discuss with home owner stapling, box make-up,fee wire,Romex1 1/4 from edge of framing member
ELE10-02680 Final5/2/20115/3/20115/3/2011 8:28:19 AMACANC
Brian--house only Phone #: ###-####