FIR16-00278
| INSP-Sprinkler Rough-in | 5/3/2016 | 5/3/2016 | 5/3/2016 2:23:33 PM | P | DONE |
|
|
Roughin for hangars in drop ceiling/kitchen area. One hangar missing from drop to the left of exhaust hood.
|
NAF15-00045
| INSP-Sprinkler Rough-in/Hydro | 5/2/2016 | 5/3/2016 | 5/3/2016 1:43:10 PM | A | FAIL |
|
|
Hydrostatic test Fail. Will need to be recompleted.
Roughin completed satisfactory. Ok to cover. Verified upright sprinklers in concealed pocket spaces, 4 dry sidewalls, earthquake bracing and pipe sizes match resubmitted plans as noted from previous inspection. Additionally inspected pendant drops.
Minor items to be completed for Final: -Missing coverage at File room (pendant to be moved over) -revised set of plans onsite - remove tape from uprights in janitor rm and ensure they have not been painted
|
NAF15-00042
| INSP-Sprinkler Rough-in/Hydro | 5/2/2016 | 5/3/2016 | 5/3/2016 11:55:27 AM | A | PASS |
|
|
Underground hydro completed satisfactory.
|