FIR17-00077
| INSP-Final Inspection | 5/3/2017 | 5/3/2017 | 5/3/2017 12:28:54 PM | P | PASS |
|
|
Permit finaled
|
FIR16-00806
| INSP-Sprinkler Rough-in | 5/3/2017 | 5/3/2017 | 5/3/2017 12:27:56 PM | P | CANC |
|
|
Duplicate inspection
|
FIR16-00806
| INSP-Sprinkler Rough-in | 5/2/2017 | 5/3/2017 | 5/3/2017 12:27:29 PM | A | PASS |
|
|
Earth quake bracing and branchline restraints have been corrected. All piping can be covered
|
FIR17-00077
| INSP-Alarm Testing | 5/2/2017 | 5/3/2017 | 5/3/2017 11:03:23 AM | A | DONE |
|
|
scope of work passed
|
FIR17-00074
| INSP-Alarm Testing | 5/2/2017 | 5/3/2017 | 5/3/2017 11:02:00 AM | A | DONE |
|
|
scope of work passed
|