Inspections for the day of: Thursday, May 3, 2018.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDan Ediger
TitlePLM-INSPECTOR
Phone #869-5166
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM15-01417 DOC - Permit Expired5/3/20185/3/20185/3/2018 3:45:43 PMPPASS
No inspections scheduled
PLM18-01809 Final5/3/20185/3/20185/3/2018 3:28:50 PMPPASS
Phone #: ###-#### Inspection requested via web by Devony Bullard
PLM18-01691 Plumbing Rough-in5/2/20185/3/20185/3/2018 2:59:41 PMPFAIL
JOB # 19694 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes. Corrections not complete
PLM18-01804 Water Heater Final5/2/20185/3/20185/3/2018 2:38:50 PMPPASS
Tenant will be home after 2:30. If access before that is needed please call manager Jen at ###-#### Phone #: ###-#### Inspection requested via web by Josh Johnson
PLM18-01483 Final5/3/20185/3/20185/3/2018 2:16:02 PMPPASS
Phone #: ###-#### Inspection requested via web by Krista Boss
PLM17-03568 Final5/2/20185/3/20185/3/2018 2:09:14 PMPPASS
PM / Please call the customer when on way: Dave and Janet Hiatt ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss
PLM18-01769 Final5/3/20185/3/20185/3/2018 1:25:10 PMPPASS
Please call Jim 30 min prior to arrival Phone #: ###-#### Inspection requested via web by Andrea Grigsby
PLM18-01696 Groundwork5/2/20185/3/20185/3/2018 1:09:29 PMPPASS
PLM18-00842 Groundwork5/3/20185/3/20185/3/2018 11:58:48 AMPPASS
Grease trap
PLM18-00554 Final5/2/20185/3/20185/3/2018 11:55:21 AMAFAIL
#51285 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes.
The water softener drain requires an 1-1/2" air gap into the drain.
PLM16-01473 DOC - Permit Expired5/3/20185/3/20185/3/2018 11:49:53 AMPPASS
failure to schdule
PLM15-01235 PLM-Aging Inspection5/3/20185/3/20185/3/2018 11:48:20 AM PEND
PLM18-01707 Plumbing Rough-in5/2/20185/3/20185/3/2018 11:46:20 AMPPASS
Phone #: ###-#### Inspection requested via web by Jason Gonzalez
PLM18-01706 Plumbing Rough-in5/2/20185/3/20185/3/2018 11:46:04 AMPPASS
Phone #: ###-#### Inspection requested via web by Jason Gonzalez
PLM18-01753 Final4/30/20185/3/20185/3/2018 11:35:51 AMAPASS
Please call when on way Phone #: ###-#### Inspection requested via web by JEREMY LINK
PLM18-01725 Plumbing Rough-in5/2/20185/3/20185/3/2018 11:23:44 AMAPASS
Phone #: ###-#### Inspection requested via web by Nicholas Paige
PLM18-01141 Final5/2/20185/3/20185/3/2018 10:54:31 AMAPEND
Please call Johnny with questions ###-####. Thank you Phone #: ###-#### Inspection requested via web by Jennifer Alcala. Met with Jonny. The floor sink vent in the middle of the floor needs to be relocated or the floor sink must be perm capped under the floor and the floor sink must be fulled with morter to the floor level.
PLM18-00842 Groundwork5/2/20185/3/20185/3/2018 10:11:09 AMAFAIL
Juan Phone #: ###-####. The grease trap vents must roll off the horizontal
PLM18-01484 Plumbing Rough-in5/2/20185/3/20185/3/2018 9:44:59 AMAPEND
Andy Phone #: ###-####. conference to go over correction notice from 5/2
PLM17-05032 Groundwork5/2/20185/3/20185/3/2018 9:42:58 AMAFAIL
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER.
A fixture fitting cannot be laid in the horizontal. Two wye branch fittings must be used.
PLM18-01483 Final4/27/20185/3/20185/3/2018 9:02:59 AMACANC
please call ###-#### Phone #: ###-#### >> Inspection requested via web by Krista Boss Inspection cancelled from web by: Krista Boss