Inspections for the day of: Thursday, May 3, 2018.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00323 INSP-Sprinkler Rough-in5/3/20185/3/20185/3/2018 3:56:35 PMPCANC
Phone #: ###-#### Inspection requested via web by Sam Ball
FIR16-00563 INSP-Sprinkler Rough-in5/3/20185/3/20185/3/2018 3:33:27 PMPPART
Rough to cover inspection for overhead fire sprinkler piping above hardlids on levels 2 and 3 complete, hardlids on levels 2 and 3 approved for cover, drop in ceilings will be inspected at a later date.

Coordinate Inspection With Lonnie Phone #: ###-#### Inspection requested via web by Christophe Wilson
FIR18-00208 INSP-Sprinkler Rough-in/Hydro5/3/20185/3/20185/3/2018 1:24:09 PMPDONE
Hydrostatic test for overhead fire sprinkler piping on level 3 witnessed, no pressure loss observed at riser provided gauge.

Early as possible // Randy Phone #: ###-####
FIR18-00191 INSP-Sprinkler Rough-in/Hydro5/3/20185/3/20185/3/2018 12:08:56 PMPDONE
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauge.

Coordinate with Roy Phone #: ###-#### Inspection requested via web by Christophe Wilson
FIR17-00041 INSP-Final Inspection5/3/20185/3/20185/3/2018 12:08:02 PMPPASS
Annual inspection has been completed, final fire sprinkler inspection for area of work complete.

I believe the Fire Sprinkler annual Inspection is Complete per Jim Page. Please call Jeff Packham With Questions. Phone #: ###-#### Inspection requested via web by Jeff Packham
FIR18-00294 INSP-Final Inspection5/2/20185/3/20185/3/2018 10:31:50 AMAPASS
Final inspection for AES communicator complete.

White Pine Elementary - final for AES radio install - has dedicated power, grounding - final with Fire Tech Peter Namouv Phone #: ###-#### Inspection requested via web by Laura Tyson
BLD18-00625 FIRE-Final Inspection5/2/20185/3/20185/3/2018 9:50:32 AMAPASS
No fire sprinklers, no fire alarms, fire extinguisher is in place with a current inspection tag. Final life fire safety inspection for area of work complete.

Mark Phone #: ###-####
BLD17-03533 FIRE-Final Inspection5/3/20185/3/20185/3/2018 9:24:03 AMPPASS
Final life fire safety inspection for area of work complete.
BLD17-02841 FIRE-Final Inspection5/2/20185/3/20185/3/2018 9:21:54 AMAPASS
Final life fire safety inspection for area of work complete.
FIR18-00095 INSP-Sprinkler Rough-in5/2/20185/3/20185/3/2018 9:21:54 AMAPASS
Rough to cover inspection for overhead fire sprinkler piping complete, approved for cover.

Jon Beazer is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00051 INSP-Sprinkler Rough-in/Hydro5/2/20185/3/20185/3/2018 8:34:24 AMACANC
Hydrostatic test cancelled per conversation with point of contact, hydro will be rescheduled for a later date.

Jon Beazer is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus