MEC01-00933
| MEC-Aging Inspection | 5/30/2001 | 5/30/2001 | 5/30/2001 12:00:00 AM | | NR |
|
|
still under construction 5/30/2001 9:45:55 AM
|
MEC01-01566
| Rough-in | 5/29/2001 | 5/30/2001 | 5/30/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/29/2001 at 13:07:16. Contact: ###-####. triple wall vent at ceiling ok 5/30/2001 11:15:11 AM
|
MEC01-00487
| Final | 5/29/2001 | 5/30/2001 | 5/30/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/29/2001 at 13:42:38. Contact: ###-####. need 1/2" i.d. gas flex connector to furn..need shut off at f/p..wire a/c disc 5/30/2001 11:24:33 AM
|
MEC01-01574
| Pressure Test | 5/29/2001 | 5/30/2001 | 5/30/2001 12:00:00 AM | A | PASS |
|
|
randy ###-####
|
MEC01-01580
| Final | 5/29/2001 | 5/30/2001 | 5/30/2001 12:00:00 AM | A | FAIL |
|
|
###-#### need 1" clear at b-vent..need secondary drain at furn cond 5/30/2001 11:15:45 AM
|
MEC01-01581
| Final | 5/29/2001 | 5/30/2001 | 5/30/2001 12:00:00 AM | A | PASS |
|
|
KEY IS UNDER FLAT ROCK AT BASE OF GAS METER ###-####
|
MEC01-01547
| Rough-in | 5/29/2001 | 5/30/2001 | 5/30/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/29/2001 at 15:07:25. Contact: ###-####.
|
MEC01-01548
| Rough-in | 5/29/2001 | 5/30/2001 | 5/30/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 05/29/2001 at 15:09:41. Contact: ###-####.
|
MEC01-01582
| Rough-in | 5/30/2001 | 5/30/2001 | 5/30/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC01-01582
| Pressure Test | 5/30/2001 | 5/30/2001 | 5/30/2001 12:00:00 AM | P | PASS |
|
|
|
MEC01-00290
| Final | 5/30/2001 | 5/30/2001 | 5/30/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/30/2001 at 09:04:41. Contact: ###-####.
|
MEC01-00411
| Final | 5/30/2001 | 5/30/2001 | 5/30/2001 12:00:00 AM | P | NR |
|
|
key pad 5575enter ###-####
|