Inspections for the day of: Friday, May 30, 2003.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM03-00221 Plumbing Rough-in5/28/20035/30/20035/30/2003 12:00:00 AMAPART
SAM; Phone #: ###-#### Internet Inspection Request from: Darla Downs drain,s waste and vent,s test ok hot and cold water system on east side of building test ok still need to finish water system on west side of building 5/30/2003 2:09:37 PM
PLM03-00696 Final5/29/20035/30/20035/30/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 5/29/2003 at 1:57:28 PM. Contact: ###-####. additional cross control connection may be required for the make up water for the boiler have schedule a walk through with Bill with united water and Lee Rice for the 2 or 3 of june 5/30/2003 4:40:48 PM
PLM03-00312 Storm Drains5/30/20035/30/20035/30/2003 12:00:00 AMAFAIL
need to correct reverse grade in storm system on south side of building called contractor will recall when ready 5/30/2003 10:21:26 AM
PLM03-00736 Plumbing Rough-in5/30/20035/30/20035/30/2003 12:00:00 AMPPART
Phone #: ###-#### Internet Inspection Request from: Liz Sasser rough-in on west side of building test ok ok to cover 5/30/2003 4:18:26 PM
PLM03-00711 Final5/30/20035/30/20035/30/2003 12:00:00 AMPPASS
PLM03-01384 Water and/or Sewer5/30/20035/30/20035/30/2003 12:00:00 AMPPASS
mike sewer only; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
PLM03-01562 Water and/or Sewer5/30/20035/30/20035/30/2003 12:00:00 AMPPASS
###-#### shelby