PLM03-00221
| Plumbing Rough-in | 5/28/2003 | 5/30/2003 | 5/30/2003 12:00:00 AM | A | PART |
|
|
SAM; Phone #: ###-#### Internet Inspection Request from: Darla Downs drain,s waste and vent,s test ok hot and cold water system on east side of building test ok still need to finish water system on west side of building 5/30/2003 2:09:37 PM
|
PLM03-00696
| Final | 5/29/2003 | 5/30/2003 | 5/30/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 5/29/2003 at 1:57:28 PM. Contact: ###-####. additional cross control connection may be required for the make up water for the boiler have schedule a walk through with Bill with united water and Lee Rice for the 2 or 3 of june 5/30/2003 4:40:48 PM
|
PLM03-00312
| Storm Drains | 5/30/2003 | 5/30/2003 | 5/30/2003 12:00:00 AM | A | FAIL |
|
|
need to correct reverse grade in storm system on south side of building called contractor will recall when ready 5/30/2003 10:21:26 AM
|
PLM03-00736
| Plumbing Rough-in | 5/30/2003 | 5/30/2003 | 5/30/2003 12:00:00 AM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Liz Sasser rough-in on west side of building test ok ok to cover 5/30/2003 4:18:26 PM
|
PLM03-00711
| Final | 5/30/2003 | 5/30/2003 | 5/30/2003 12:00:00 AM | P | PASS |
|
|
|
PLM03-01384
| Water and/or Sewer | 5/30/2003 | 5/30/2003 | 5/30/2003 12:00:00 AM | P | PASS |
|
|
mike sewer only; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
PLM03-01562
| Water and/or Sewer | 5/30/2003 | 5/30/2003 | 5/30/2003 12:00:00 AM | P | PASS |
|
|
###-#### shelby
|