ESC06-00861
| Conference | 5/30/2006 | 5/30/2006 | 5/30/2006 3:29:00 PM | P | DONE |
|
|
|
ESC05-01744
| Tracking Control | 5/30/2006 | 5/30/2006 | 5/30/2006 3:06:59 PM | P | PART |
|
|
Overall site looks good except minor dirt on street and some trash not containerized. Informed rp of areas needing attention.
|
ESC05-02023
| Random Inspection | 5/30/2006 | 5/30/2006 | 5/30/2006 2:56:00 PM | P | FAIL |
|
|
Correction to rp; Need concrete wash out area, maintain drop inlet, top dressing at construction entrance, management of soldi waste debris. Will follow up.
|
ESC06-00360
| Random Inspection | 5/30/2006 | 5/30/2006 | 5/30/2006 2:50:32 PM | P | PART |
|
|
Corrections made per verbal comments. Still need acceptable measures installed to properly clean out mortal and other concrete.
|
ESC05-01045
| Site Final | 5/30/2006 | 5/30/2006 | 5/30/2006 1:01:48 PM | P | DONE |
|
|
|
ESC05-01765
| Random Inspection | 5/30/2006 | 5/30/2006 | 5/30/2006 9:25:43 AM | A | FAIL |
|
|
Correction to rp; drop inlets unprotected; no signage. Informed rp to obtain compliance by the end of the day of further enforcement will occur. Will follow up
|