Inspections for the day of: Friday, May 30, 2008.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC05-01871 Aging Inspection5/30/20085/30/20086/4/2008 10:41:59 AM DEFR
Moved to a site final.
CAS
#460
ESC05-01920 Aging Inspection5/30/20085/30/20086/3/2008 8:53:14 AM DEFR
Moved to a site final
CAS
#460
ESC05-01931 Aging Inspection5/30/20085/30/20086/2/2008 4:10:03 PM DEFR
Moved to a site final
CAS
#460
ESC08-00295 Site Preparation5/30/20085/30/20085/30/2008 4:05:41 PMPNR
Left a message for the RP.
CAS
#460
ESC07-01595 Site Preparation5/30/20085/30/20085/30/2008 3:45:06 PMPNR
Left message with Rp. Work has not begun yet. They have installed a temporary chain link fence for access control. NO ESC sign posted.
CAS
#460
ESC08-00325 Site Preparation5/30/20085/30/20085/30/2008 3:39:01 PMPNR
Work has not begun. Discussed with RP over the project and told him the steps he will need to take.
CAS
#460
ESC05-01902 Aging Inspection5/30/20085/30/20085/30/2008 2:50:18 PM DEFR
Moved to a site final
CAS
#460
ESC05-01902 Site Final5/30/20085/30/20085/30/2008 2:50:13 PMPPASS
All disturbed soil has been stabilized.
CAS
#460
ESC08-00400 Random Inspection5/30/20085/30/20085/30/2008 2:48:55 PMPPASS
site looks good.
CAS
#460
ESC08-00419 BMP Violation5/29/20085/30/20085/30/2008 2:30:39 PMPDONE
Met with Rp over the issues pertaining with his project and showed him the step to become compliant. Will re-inspect on 6/3/08
CAS
#460
ESC08-00324 Site Final5/29/20085/30/20085/30/2008 11:17:14 AMAPASS
Refer to ESC 08-00230
ESC08-00230 Random Inspection5/30/20085/30/20085/30/2008 11:16:38 AMPPASS
Filtration of water is coming along good. The steps that have been taken are working well.
CAS
#460
ESC08-00412 Site Preparation5/30/20085/30/20085/30/2008 9:45:23 AMAPASS
was called by the RP for a 48hr notice to proceed to inspect there project. Site looks good.
CAS
#460
ESC05-01869 Site Final5/30/20085/30/20085/30/2008 9:32:35 AMPPASS
All work is completed on project. Site has been stabilized with final landscaping.
CAS
#460
ESC07-00842 General Inspection5/29/20085/30/20085/29/2008 3:39:48 PMAPART
Discussed with Rp over the slope issue. A sediment barrier BMP is still needed until the seed takes at the slope. Also the RP is still the RP for the retaining wall also.
CAS
#460