BLD12-00002
| FIRE-Final Inspection | 5/29/2012 | 5/30/2012 | 5/30/2012 4:03:36 PM | A | FAIL |
|
|
The required street width as approved by the fire dept. has not been met. Romeo Gervais has been notified and has requested information from the engineer prior to a sign off on this permit. All other items are ok.
|
BLD11-02685
| FIRE-Final Inspection | 5/30/2012 | 5/30/2012 | 5/30/2012 4:01:53 PM | P | CANC |
|
|
The required street width as approved by the fire dept. has not been met. Romeo Gervais has been notified and has requested information from the engineer prior to a sign off on this permit. All other items are ok.
|
BLD12-01204
| FIRE-Final Inspection | 5/30/2012 | 5/30/2012 | 5/30/2012 3:36:07 PM | P | FAIL |
|
|
Provide exit signs , as shown on the approved plans. The exit sign placement at the main exit is ok. Provide emergency lighting in the warehouse and office areas. Additional lighting is required at the north end of the warehouse. Provide single action, lever, hardware on all exterior exit doors as per the approved plans. Remove all dead bolts. The main exit door is ok to be keyed as long as the sticker "door to remain unlocked when buildign is occupied" is place at the exit. Provide singel action hardware on the interior doors at the pass through from the warehouse and the east office. Provide 2A, 10BC fire extinguishers with current inspection tags mounted 5' to 4" off of the finish floor. Provide two in the warehouse and one for the office area.
|
BLD12-00828
| FIRE-Final Inspection | 5/30/2012 | 5/30/2012 | 5/30/2012 3:16:20 PM | P | PASS |
|
|
life safety passed
|
BLD12-00827
| FIRE-Conference | 5/30/2012 | 5/30/2012 | 5/30/2012 3:15:22 PM | P | DONE |
|
|
Bill and I went over life safety requirements. One exit at the end of a short corridor, with exit sign/emergency light on the north side of the building, has been walled off and is now in an office. Also Bill is interested in possibly deleting exit signs. I deferred deleting signs and the wall changes to the plan reviewer for re-verification. We also discussed relocating signs to where they will be more visable. Door hardware is not yet complete nor is the south store front assembly.
|
FIR12-00250
| INSP-Sprinkler Rough-in/Hydro | 5/30/2012 | 5/30/2012 | 5/30/2012 2:04:15 PM | P | PASS |
|
|
Overhead hydro test passed. Rough-in passed. Sprinkler piping can be covered.
|
BLD12-00860
| FIRE-Sprinkler Rough-in | 5/30/2012 | 5/30/2012 | 5/30/2012 2:03:39 PM | P | PASS |
|
|
Sprinkler piping is ok to cover.
|
FIR12-00257
| INSP-Final Inspection | 5/30/2012 | 5/30/2012 | 5/30/2012 1:23:46 PM | P | CANC |
|
|
No access to project. Sam will reschedule.
|
FIR12-00256
| INSP-Final Inspection | 5/30/2012 | 5/30/2012 | 5/30/2012 1:23:20 PM | P | CANC |
|
|
No access to project. Sam will reschedule.
|