FIR17-00120
| INSP-Sprinkler Rough-in/Hydro | 5/30/2017 | 5/30/2017 | 5/30/2017 12:49:29 PM | P | PASS |
|
|
Under ground hydro test passed
|
FIR17-00143
| INSP-Final Inspection | 5/26/2017 | 5/30/2017 | 5/30/2017 12:36:50 PM | P | CANC |
|
|
Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price
|
FIR17-00097
| INSP-Sprinkler Rough-in | 5/26/2017 | 5/30/2017 | 5/30/2017 12:36:40 PM | P | CANC |
|
|
Mike Phone #: ###-####
|
BLD16-03558
| FIRE-Final Inspection | 5/26/2017 | 5/30/2017 | 5/30/2017 11:49:09 AM | A | CANC |
|
|
Need the project related fire alarm permit scheduled and passed prior to a life safety inspection.
Larrin Phone #: ###-####
|
BLD17-01539
| FIRE-Final Inspection | 5/25/2017 | 5/30/2017 | 5/30/2017 9:12:03 AM | A | FAIL |
|
|
Repair or remove the exit signs in the rear storage area, mount and tag the fire extinguishers as discussed/per plan.
Michele Mahawili Phone #: ###-####
|
FIR17-00107
| INSP-Sprinkler Rough-in | 5/26/2017 | 5/30/2017 | 5/30/2017 8:44:02 AM | A | PASS |
|
|
The thrust blocks have been poured. Underground supply piping can be covered.
|
BLD17-00783
| FIRE-Final Inspection | 5/23/2017 | 5/30/2017 | 5/30/2017 8:43:22 AM | A | FAIL |
|
|
Provide information to the plan reviewer about the basement that is not shown on the city approved plans, provide modifications to the existing hood suppression system and provide K class fire extinguisher.
Alberto Phone #: ###-####
|