Inspections for the day of: Wednesday, May 30, 2018.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-01984 Rough-In Permanent Service5/29/20185/30/20185/30/2018 2:45:36 PMACANC
Phone #: ###-#### Inspection requested via web by Alan Lusk
ELE18-02004 Permanent Service5/30/20185/30/20185/30/2018 2:45:27 PMPPASS
Casey Phone #: ###-####
2nd meter being added to meter power used in garage seperate from house for business purposes. Garage is to have covered walls in future. Informed at time of final all horizontal wiring shall be protected from damage as per 110.27. Feeders and grounding done at time of inspection.
p/s o/h rec ok
ELE18-02017 Permanent Service5/30/20185/30/20185/30/2018 2:32:09 PMPPASS
Mast damaged by tree limb and being replaced. Plumbing bond in place and ground rods going in at time of inspection. Will confirm labels, grounding, intersystem bond at final. p/s o/h rec ok
ELE18-01113 Final5/30/20185/30/20185/30/2018 2:14:02 PMPPASS
Phone #: ###-#### Inspection requested via web by Brad Girard Final ok
ELE18-02007 Electrical Rough-In5/30/20185/30/20185/30/2018 1:55:32 PMPPASS
Zac on site. Walls ri inspection. Phone #: ###-#### Inspection requested via web by Garrett Collins
Main level bed and bath/ closets and basement bath rough in ok cover
ELE18-01724 Electrical Rough-In5/30/20185/30/20185/30/2018 1:17:33 PMPPASS
ug conduit Phone #: ###-#### Inspection requested via web by Lee VanSchoiack
Branch circuit underground to be done in future. Service entrance conduits under slab rough in ok cover
ELE18-01998 Electrical Rough-In5/30/20185/30/20185/30/2018 12:43:51 PMPPASS
Please call Tyler Reed (###-####) for specifics prior to arrival. Phone #: ###-#### Inspection requested via web by Scott Campbell
Underground and stubs to footing and stem walls rough in ok cover
ELE17-04193 Final5/29/20185/30/20185/30/2018 11:19:26 AMAFAIL
Matt. Call prior to heading to the site. Phone #: ###-#### Inspection requested via web by Sean DeLacy
210.8(B)- All receptacle outlets located with in 6' of a sink shall have GFCI protection. Pop counter.
408.7- Unused openings shall be closed by approved means. High voltage panel needs breaker blanks.
426.28- Equipment shall be protected by an equipment protection device. EPD on heat tape circuit.
ELE18-01951 Electrical Rough-In5/29/20185/30/20185/30/2018 10:46:20 AMAPASS
ufer ug // go to CM construction gate // Mike Phone #: ###-####
Rough in ok cover
ELE17-01337 Electrical Rough-In5/29/20185/30/20185/30/2018 10:17:01 AMAPASS
We are requesting a final inspection for underground for tomorrow morning. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
Underground front pole lights and bases rough in ok cover
ELE18-01407 Final5/29/20185/30/20185/30/2018 9:50:35 AMAPASS
Phone #: ###-#### Inspection requested via web by Mark M
Final ok
ELE18-01968 Rough-In Permanent Service5/25/20185/30/20185/30/2018 9:23:45 AMAPASS
Phone #: ###-#### Inspection requested via web by Alan Lusk
Rough in ok cover p/s u/g n ok