Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00939 BLD-Other5/31/20005/31/20006/1/2000 12:00:00 AM FAIL
Call from Michael Nigh with Petra and plan modification is being prepared by Pinicle Engineering and the are going to attempt to continue to use Mark Knowles and the Engineer of Record. I told Michael that we had stopped the work on the canopy and it was now in Plan Reviews hands and until we received a new approved plan and a corrected permit no work could be done on the canopy. He said they understood and would meet with Carl Westfall and get the plan modification in the approval process. gs
BLD99-03630 BLD-Framing/Rough-in5/31/20005/31/20005/31/2000 12:00:00 AMAFAIL
W/architect & supt. & framer: C/N need details for top-of-wall w/references & HVAC modifications.
BLD00-00832 BLD-Energy code compliance5/30/20005/31/20005/31/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 05/30/2000 at 10:35:18. Contact: ###-####. Insul. ok, keep C/N. 6/1/00 11:25:01 AM
BLD00-00832 BLD-Framing/Rough-in5/30/20005/31/20005/31/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 05/30/2000 at 10:38:39. Contact: ###-####. Keep C/N- truss bracing. 6/1/00 11:24:31 AM
BLD00-00680 BLD-Framing/Rough-in5/30/20005/31/20005/31/2000 12:00:00 AMAFAIL
framing reinspection dave ###-####
N/R- recall. 6/1/00 11:24:39 AM
MIS00-00132 BLD-Final5/30/20005/31/20005/31/2000 12:00:00 AMAPASS
HIEU ###-#### REINSPECTION Ok for C/O. 6/1/00 11:24:49 AM
MEC00-01804 Pressure Test5/30/20005/31/20005/31/2000 12:00:00 AMAPASS
###-####\ GAS TEST FOR WATER HEATER
BLD00-01031 BLD-Framing/Rough-in5/30/20005/31/20005/31/2000 12:00:00 AMPPART
skip ###-#### -demising wall insp Add screws @ studs- ok to continue. 6/1/00 11:25:53 AM
BLD99-02745 BLD-Framing/Rough-in5/31/20005/31/20005/31/2000 12:00:00 AMPFAIL
Mark Estep ###-#### Foyer area @ front: C/N, need arch's clarification re: shear panel locations. 6/1/00 2:30:48 PM
MEC00-01787 Rough-in5/31/20005/31/20005/31/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 05/31/2000 at 08:32:23. Contact: ###-####. PT failed 5/31/00 4:31:16 PM
BLD99-02086 BLD-Framing/Rough-in5/30/20005/31/20005/31/2000 12:00:00 AMPPART
###-#### sheer wall and straps 1st fl. ext. "shear" walls. 6/1/00 11:25:30 AM
BLD99-02518 BLD-Final5/30/20005/31/20005/31/2000 12:00:00 AMPPASS
###-#### 726877 P&Z ok, ok for C/O. 6/1/00 11:25:42 AM
BLD00-00198 BLD-Final5/31/20005/31/20005/31/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 05/31/2000 at 09:02:18. Contact: ###-####. L/C issued. 6/1/00 11:26:29 AM
BLD00-00907 BLD-Final5/31/20005/31/20005/31/2000 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 05/31/2000 at 11:18:12. Contact: ###-####. Made by 350 6/1/00 11:26:02 AM