PLM01-01756
| Groundwork | 5/30/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | A | PASS |
|
|
groundwork- bruce ###-####
|
PLM01-01737
| Plumbing Rough-in | 5/30/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | A | PART |
|
|
call 1st before insp-- ###-#### for todd ri ok with water heater pan and drain for the 2nd floor apt. 5/31/2001 9:00:31 AM
|
PLM01-00538
| Storm Drains | 5/31/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/31/2001 at 08:33:45. Contact: ###-####. 4 west overflow drains 5/31/2001 2:13:33 PM
|
PLM01-01459
| Final | 5/31/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/31/2001 at 09:00:26. Contact: ###-####.
|
PLM01-01770
| Water and/or Sewer | 5/31/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | P | PASS |
|
|
###-#### water line only and shutoff and drain for a future sprinkler system 5/31/2001 2:29:10 PM
|
PLM01-01541
| Water and/or Sewer | 5/31/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 5/31/2001 1:48:12 PM interceptor test and vents and discharge to inside building
|
PLM01-01083
| Water Heater Final | 5/29/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/29/2001 at 12:22:15. Contact: ###-####. please call before going out
|