ELE01-01781
| Rough-In Permanent Service | 5/30/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | A | PASS |
|
|
###-####. ele r/i; perm/svc. ok
p/s oh n degrange ele #1781
ok 5/31/2001 9:47:34 AM
|
ELE01-01783
| Temporary Service | 5/30/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | A | PASS |
|
|
temporary power pole, ok.
t/s ug degrange ele #1783 5/31/2001 11:31:05 AM
|
ELE01-01606
| Electrical Rough-In | 5/30/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/30/2001 at 14:34:23. Contact: ###-####. table 300-5. p.v.c. conduit shall be no less than 18 inches depth in trench. 5/31/2001 10:39:20 AM
|
ELE01-01467
| Electrical Rough-In | 5/30/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | A | PASS |
|
|
###-####. perm/svc ok.
p/s ug n frank's ele #1467
new 2nd meter/service panel at garage in rear. 5/31/2001 9:10:58 AM
|
ELE01-00202
| Final | 5/31/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 05/31/2001 at 08:01:43. Contact: ###-####. no access; called contractor he will reschedule. 5/31/2001 2:05:50 PM
|
ELE01-00333
| Final | 5/31/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/31/2001 at 08:02:31. Contact: ###-####.. completed, ok. 5/31/2001 4:29:16 PM
|
ELE01-00565
| Electrical Rough-In | 5/31/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | P | PASS |
|
|
conference ###-#### . code requirements for meter/main service (4-plex) upgrade. 5/31/2001 2:51:04 PM
|
ELE00-00669
| Electrical Rough-In | 5/30/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | P | PART |
|
|
2nd floor-- r/i- mike cell ###-####. ceiling r/i. ok 5/31/2001 4:30:01 PM
|