Inspections for the day of: Thursday, May 31, 2001.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00281 BLD-Aging Inspection5/31/20015/31/20015/31/2001 12:00:00 AM PART
expires 8/01. 12/31/2001 10:06:57 AM
BLD00-02740 BLD-Footing5/29/20015/31/20015/31/2001 12:00:00 AMANR
###-#### bryan wil recall. 12/31/2001 11:19:58 AM
BLD00-02944 BLD-Final5/30/20015/31/20015/31/2001 12:00:00 AMAPASS
GATE CODE 7208 ###-#### special inspection has been provided for concrete cylindr test, exceeds required strength of 28 days 400 psi, meet compliance at 7 day test of 4660, Boise City had not been called out to inspect rebar. 12/31/2001 10:18:42 AM fer 12/31/2001 10:18:47 AM 12/31/2001 10:19:39 AM
BLD01-01234 BLD-Final5/30/20015/31/20015/31/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 05/30/2001 at 16:14:38. Contact: ###-####. add 2 bolts to the column and install door for a final other work , door frame appears as per plans bolting and welding has been completed. no special inspections were indicated on plans. 12/31/2001 11:01:59 AM
BLD00-02817 BLD-Framing/Rough-in5/30/20015/31/20015/31/2001 12:00:00 AMAFAIL
###-#### hold downs under windows, also need connections at west side provide from engineer. 12/31/2001 12:21:03 PM
BLD00-03691 BLD-Framing/Rough-in5/30/20015/31/20015/31/2001 12:00:00 AMAFAIL
###-#### need some osb shear wall not gyp. 12/31/2001 12:21:24 PM
MEC01-01173 Rough-in5/30/20015/31/20015/31/2001 12:00:00 AMAPASS
###-####
BLD01-01224 BLD-Foundation5/31/20015/31/20015/31/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05 /31/2001 at 07:10:04. Contact: .small store front sign approx 8 foot wide by 16 in high ,(pederson`s). has been installed, and appears ok . no notes or description on permit case info ? 12/31/2001 10:58:45 AM
BLD01-00061 BLD-Foundation5/30/20015/31/20015/31/2001 12:00:00 AMPPASS
found kevin ###-#### insulation installed at inside wall. slab now ready to pour.12/31/2001 2:35:26 PM 12/31/2001 2:41:19 PM
BLD01-00900 BLD-Foundation5/30/20015/31/20015/31/2001 12:00:00 AMPPART
found wall-- gary ###-#### wip. 12/31/2001 3:44:23 PM
BLD01-01229 BLD-Foundation5/31/20015/31/20015/31/2001 12:00:00 AMPPART
Tony ###-#### pour in progress. 12/31/2001 2:15:05 PM
BLD00-02811 BLD-Energy code compliance5/31/20015/31/20015/31/2001 12:00:00 AMPPASS
John ###-####
BLD01-01072 BLD-Framing/Rough-in5/31/20015/31/20015/31/2001 12:00:00 AMPPASS
Dirk ###-#### please call before you go out
BLD01-00988 BLD-Framing/Rough-in5/31/20015/31/20015/31/2001 12:00:00 AMPCANC
JP ###-#### canc per cont. 12/31/2001 1:53:35 PM