BLD01-00342
| BLD-Foundation | 5/30/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | A | PART |
|
|
Jack Wright ###-####
walls ok, conf. on roof framing, ok to use eng. attic trusses instead of rafters, 5/31/2001 9:52:38 AM
|
BLD01-00715
| BLD-Framing/Rough-in | 5/30/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | A | PART |
|
|
charlie ###-#### shear
all ok except Charlie is getting letter from arch. on east swp on rear patio door, also change of plans on rear patio fence 5/31/2001 11:38:22 AM
|
BLD01-00719
| BLD-Framing/Rough-in | 5/30/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | A | PART |
|
|
shear terry ###-####
ok after corrections on nailing 5/31/2001 12:19:11 PM
|
BLD01-01366
| BLD-Footing | 5/30/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/30/2001 at 13:59:57. Contact: ###-####.
already poured 5/31/2001 11:39:19 AM
|
BLD00-03155
| BLD-Energy code compliance | 5/30/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD00-03698
| BLD-Final | 5/30/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 05/30/2001 at 20:08:39. Contact: ###-####.
|
BLD01-00522
| BLD-Framing/Rough-in | 5/30/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/30/2001 at 21:51:29. Contact: ###-####.
c/n posted, ok to insulate 5/31/2001 1:27:37 PM
|
BLD01-01306
| BLD-Foundation | 5/31/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/31/2001 at 07:25:08. Contact: ###-####.
|
BLD01-01367
| BLD-Final | 5/31/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | P | PASS |
|
|
Bill ###-#### if any prombles
|
BLD01-01353
| BLD-Footing | 5/31/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | P | PART |
|
|
###-#### wip, verbal corrections 5/31/2001 1:59:01 PM
|
BLD01-00522
| BLD-Framing/Rough-in | 5/31/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | P | NR |
|
|
5/31/2001 11:43:22 AM
|
BLD98-01721
| BLD-Conference | 5/29/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | P | PASS |
|
|
Tamera Effort ###-####
ok to continue, talked about various items, need to nail shear better 5/31/2001 4:30:23 PM
|
BLD00-01824
| BLD-Final | 5/30/2001 | 5/31/2001 | 5/31/2001 12:00:00 AM | P | PART |
|
|
call first to meet ###-####
pending s. i. final report and possible other sign offs 5/31/2001 4:52:37 PM
|