Inspections for the day of: Friday, May 31, 2002.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01219 BLD-Conference5/30/20025/31/20025/31/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/30/2002 at 14:32:24. Contact: ###-####. w/ bldr re 2nd story add'n...use existing roof joists...verify adequacy when opened...call for insp at that time. 5/31/2002 11:34:13 AM
MEC02-01463 Pressure Test5/30/20025/31/20025/31/2002 12:00:00 AMANR
RANDY ###-#### gage??? 5/31/2002 10:55:51 AM
MEC02-01463 Rough-in5/30/20025/31/20025/31/2002 12:00:00 AMAPART
RANDY ###-#### box & flue are in, complete external gas valve install 5/31/2002 10:58:10 AM
BLD02-01219 BLD-Footing5/30/20025/31/20025/31/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 05/30/2002 at 16:54:15. Contact: ###-####. int & porch pads ok, ok to wet set bolts & bases...use stand offs as req'd or p.t. posts at ext. 5/31/2002 11:35:24 AM
BLD02-00376 BLD-Conference5/31/20025/31/20025/31/2002 12:00:00 AMAPASS
need stamp on eng's detail for int chimney....has detail; install rails at rear ext. landing per 1003
BLD02-01195 BLD-Foundation5/30/20025/31/20025/31/2002 12:00:00 AMAPART
###-####...no approved plans...gar.front ftgs not continuous but using Idaho Truss braced frame system, drawings dont show cont ftg...appears to be in per detail. 5/31/2002 9:49:50 AM
BLD02-01191 BLD-Foundation5/30/20025/31/20025/31/2002 12:00:00 AMAPART
###-####...no approved plans, fnd fully reinforced, using Idaho Truss brace frame system at gar... appears to be per detail. 5/31/2002 9:51:11 AM
BLD02-00150 BLD-Final5/30/20025/31/20025/31/2002 12:00:00 AMPNR
###-####
BLD02-01279 BLD-Foundation5/30/20025/31/20025/31/2002 12:00:00 AMPPART
stem wall- junior- ###-#### wall ok...need to keep approved plans onsite. 5/31/2002 3:43:58 PM
BLD02-00150 BLD-Conference5/31/20025/31/20025/31/2002 12:00:00 AMPPASS
w/ bldr re accessibility issues...doesn't apply to SFD
BLD02-01279 BLD-Framing/Rough-in5/31/20025/31/20025/31/2002 12:00:00 AMPPART
wip...complete firestops at new corridor penetrations, chk at final...45 min assys ok at ext wall.
BLD01-02970 BLD-Conference5/31/20025/31/20025/31/2002 12:00:00 AMPPASS
w/ bldr re final req's: need eng's/ spec. insp reports...complete hand/guard rail installations...obtain all other perm finals.
BLD01-02970 BLD-Framing/Rough-in5/31/20025/31/20025/31/2002 12:00:00 AMPPART
###-#### DAVE elev. lobby ok to cover 5/31/2002 7:05:19 PM
BLD02-00376 BLD-Energy code compliance5/31/20025/31/20025/31/2002 12:00:00 AMPPART
###-####- ryan... floor area sheathed, upper deck floor insulated 5/31/2002 12:09:45 PM