BLD02-01219
| BLD-Conference | 5/30/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/30/2002 at 14:32:24. Contact: ###-####. w/ bldr re 2nd story add'n...use existing roof joists...verify adequacy when opened...call for insp at that time. 5/31/2002 11:34:13 AM
|
MEC02-01463
| Pressure Test | 5/30/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | A | NR |
|
|
RANDY ###-#### gage??? 5/31/2002 10:55:51 AM
|
MEC02-01463
| Rough-in | 5/30/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | A | PART |
|
|
RANDY ###-#### box & flue are in, complete external gas valve install 5/31/2002 10:58:10 AM
|
BLD02-01219
| BLD-Footing | 5/30/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/30/2002 at 16:54:15. Contact: ###-####. int & porch pads ok, ok to wet set bolts & bases...use stand offs as req'd or p.t. posts at ext. 5/31/2002 11:35:24 AM
|
BLD02-00376
| BLD-Conference | 5/31/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | A | PASS |
|
|
need stamp on eng's detail for int chimney....has detail; install rails at rear ext. landing per 1003
|
BLD02-01195
| BLD-Foundation | 5/30/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | A | PART |
|
|
###-####...no approved plans...gar.front ftgs not continuous but using Idaho Truss braced frame system, drawings dont show cont ftg...appears to be in per detail. 5/31/2002 9:49:50 AM
|
BLD02-01191
| BLD-Foundation | 5/30/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | A | PART |
|
|
###-####...no approved plans, fnd fully reinforced, using Idaho Truss brace frame system at gar... appears to be per detail. 5/31/2002 9:51:11 AM
|
BLD02-00150
| BLD-Final | 5/30/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | P | NR |
|
|
###-####
|
BLD02-01279
| BLD-Foundation | 5/30/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | P | PART |
|
|
stem wall- junior- ###-#### wall ok...need to keep approved plans onsite. 5/31/2002 3:43:58 PM
|
BLD02-00150
| BLD-Conference | 5/31/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | P | PASS |
|
|
w/ bldr re accessibility issues...doesn't apply to SFD
|
BLD02-01279
| BLD-Framing/Rough-in | 5/31/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | P | PART |
|
|
wip...complete firestops at new corridor penetrations, chk at final...45 min assys ok at ext wall.
|
BLD01-02970
| BLD-Conference | 5/31/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | P | PASS |
|
|
w/ bldr re final req's: need eng's/ spec. insp reports...complete hand/guard rail installations...obtain all other perm finals.
|
BLD01-02970
| BLD-Framing/Rough-in | 5/31/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | P | PART |
|
|
###-#### DAVE elev. lobby ok to cover 5/31/2002 7:05:19 PM
|
BLD02-00376
| BLD-Energy code compliance | 5/31/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | P | PART |
|
|
###-####- ryan... floor area sheathed, upper deck floor insulated 5/31/2002 12:09:45 PM
|