BLD01-01955
| BLD-Final | 5/30/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | A | PART |
|
|
###-####. Ok for a temp oc.needs all other signatures for a perm oc. fire caulk basement and gas room . 5/31/2002 1:39:50 PM 5/31/2002 1:40:20 PM
|
BLD01-01955
| BLD-Final | 5/30/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | A | PART |
|
|
###-####. Ok for a temp oc.needs all other signatures for a perm oc. fire caulk basement and gas room . 5/31/2002 1:39:50 PM 5/31/2002 1:40:20 PM
|
BLD02-00710
| BLD-Foundation | 5/30/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | A | PART |
|
|
found jay- ###-#### . corrected area at earth ok, but are not goning to pour only this section changed mind and now will construct more and pour at same time I told them to call back for another inspection when the rest was complete. 5/31/2002 12:30:01 PM
|
BLD02-00715
| BLD-Final | 5/30/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | A | NR |
|
|
Gary, ###-####needs all req final prior called left message. 5/31/2002 12:08:15 PM
|
BLD02-00019
| BLD-Framing/Rough-in | 5/30/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | A | NR |
|
|
SCOTT- ###-#### FR . needs all other finals, called 5/31/2002 12:06:32 PM lefty message. 5/31/2002 12:06:40 PM
|
BLD02-00160
| BLD-Final | 5/31/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/31/2002 at 07:42:31. Contact: ###-####.
|
BLD01-01778
| BLD-Foundation | 5/31/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | P | CANC |
|
|
###-#### jed. needed to pour at 12, engineer has approved via site visit. 5/31/2002 4:13:47 PM
|
BLD01-02612
| BLD-Final | 5/31/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | P | PASS |
|
|
###-#### RICHARD ok perm oc. 5/31/2002 4:06:29 PM
|
BLD01-00941
| BLD-Footing | 5/29/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | P | PART |
|
|
ft insp- drew ###-####. 50 % complete, MTI will perform special inspection. 5/31/2002 4:14:56 PM
|