BLD02-00150
| FIRE-Final Inspection | 5/30/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | A | FAIL |
|
|
###-#### Ralph need sprinkler plans submitted; corridor wall penetrations 5/31/2002 10:22:40 AM
|
BLD01-02536
| FIRE-Final Inspection | 5/30/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/30/2002 at 14:05:46. Contact: ###-####.
|
BLD02-00759
| FIRE-Final Inspection | 5/30/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | A | FAIL |
|
|
LISA ###-#### PLEASE CALL 15 MIN BEFORE SO LISA CAN MEET YOU THERE... door in 4 hour wall needs to latch, smoke seals and detector to operate mag release; repair exit sign at first floor south exit 5/31/2002 10:24:14 AM
|
BLD02-00169
| FIRE-Final Inspection | 5/31/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | P | NR |
|
|
Scheduled by Inspector: 409 On 5/31/2002 6:40:58 AM kitchen extinguishing system will be tested on 6/3/02 5/31/2002 3:48:35 PM
|
FIR02-00218
| INSP-Final Inspection | 5/31/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 409 On 5/31/2002 3:35:27 PM
|
BLD02-00150
| FIRE-Final Inspection | 5/31/2002 | 5/31/2002 | 5/31/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 409 On 5/31/2002 3:36:39 PM
|
BLD02-00759
| FIRE-Final Inspection | 5/30/2002 | 5/31/2002 | 5/30/2002 12:00:00 AM | P | CANC |
|
|
LISA ###-#### PLEASE CALL 15 MIN BEFORE SO LISA CAN MEET YOU THERE... scheduled for am 5/30/2002 2:29:21 PM
|