Inspections for the day of: Friday, May 31, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00819 BLD-Framing/Rough-in5/30/20025/31/20025/31/2002 12:00:00 AMAPART
fr terry ###-#### C/N--A-4, C2 and 3 Trusses need bracing per truss detail--ok to insulate. 5/31/2002 9:11:42 AM
MEC02-01448 Pressure Test5/30/20025/31/20025/31/2002 12:00:00 AMADONE
###-#### Taged by Gas Co. 5/30/2002 2:06:47 PM
BLD02-01216 BLD-Footing5/30/20025/31/20025/31/2002 12:00:00 AMAPASS
###-####
BLD02-00712 BLD-Wall cover5/30/20025/31/20025/31/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 05/30/2002 at 13:11:50. Contact: ###-####. Ext. shear ok-- 5/31/2002 10:50:00 AM
MEC02-01421 Rough-in5/30/20025/31/20025/31/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/30/2002 at 16:29:33. Contact: ###-####.
MEC02-01421 Pressure Test5/30/20025/31/20025/31/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/30/2002 at 16:30:08. Contact: ###-####.
MEC02-01416 Rough-in5/31/20025/31/20025/31/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/31/2002 at 06:51:17. Contact: ###-####.
BLD02-00153 BLD-Final5/31/20025/31/20025/31/2002 12:00:00 AMPFAIL
TERRY ###-#### LOCK BOX # 193 C/N on site 5/31/2002 3:01:01 PM
MEC02-00544 Final5/31/20025/31/20025/31/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 05/31/2002 at 09:14:34. Contact: ###-####.
BLD02-00893 BLD-Energy code compliance5/30/20025/31/20025/31/2002 12:00:00 AMPNR
SHEER WALL ###-#### JAY--Shear not energy--not ready for inspection. 5/31/2002 3:01:24 PM
BLD02-00914 BLD-Framing/Rough-in5/30/20025/31/20025/31/2002 12:00:00 AMPFAIL
brian- ###-#### shear nail c/ posted 5/31/2002 2:05:00 PM