BLD06-01876
| FIRE-Final Inspection | 5/31/2007 | 5/31/2007 | 6/1/2007 1:51:43 PM | P | PASS |
|
|
Fire life safety finaled.
|
FIR06-00940
| FIR-Aging Inspection | 5/31/2007 | 5/31/2007 | 6/1/2007 8:24:47 AM | | DEFR |
|
|
Work in progress, building under construction.
|
BLD06-01392
| FIRE-Final Inspection | 5/30/2007 | 5/31/2007 | 5/31/2007 3:13:14 PM | A | PASS |
|
|
Fire life safety inspection passed, contractor to install one missing exit sign as indicated on approved plans, to be verified at next visit for the adjacent remodel final.
|
FIR06-00546
| INSP-Final Inspection | 5/30/2007 | 5/31/2007 | 5/31/2007 3:11:22 PM | A | PASS |
|
|
Fire sprinkler permit finaled, noted project modification to not complete the chest room as indicated on plans, upright protection is provided for the interm.
|
BLD06-00443
| FIRE-Final Inspection | 5/31/2007 | 5/31/2007 | 5/31/2007 2:24:25 PM | P | PASS |
|
|
Fire life safety finaled.
|
BLD06-02053
| FIRE-Final Inspection | 5/31/2007 | 5/31/2007 | 5/31/2007 2:20:50 PM | P | PASS |
|
|
Corrections are complete, fire life safety inspection passed.
|
FIR06-00007
| INSP-Alarm Testing | 5/29/2007 | 5/31/2007 | 5/31/2007 2:05:11 PM | A | PART |
|
|
Walk through testing of a/v notification at the 1st , 2nd and basement floor levels only completed today, noted one horn to be replaced in the basement, some areas on the first and second floors appear to be overspaced or obstructed as noted, as-built plans need to accurately reflect locations of all devices, the 1st floor pyro room may need an additional horn, clean room areas on the 1st floor remain to be verified for a/v testing due to access issues, audibility and synchronization throughout the remainder of the project are acceptable.
|
FIR07-00034
| INSP-Sprinkler Rough-in/Hydro | 5/29/2007 | 5/31/2007 | 5/31/2007 11:27:10 AM | A | PART |
|
|
Forward flow testing for the BFP and the class one standpipe roof connection completed acceptable.
|
BLD04-00945
| FIRE-Final Inspection | 5/30/2007 | 5/31/2007 | 5/31/2007 10:55:20 AM | A | PASS |
|
|
Final fire life safety inspection passed, noted the provided PFE's to be installed in the units prior to occupancy as required.
|