GCM13-00109
| GCM-Final | 6/3/2013 | 5/31/2013 | 6/4/2013 8:07:27 AM | A | CANC |
|
|
###-#### Katie, call first..cancel barb
|
GCM13-00130
| GCM-Final | 6/3/2013 | 5/31/2013 | 6/3/2013 12:01:50 PM | P | CANC |
|
|
Mike ###-#### Call ahead for access..per barb
|
GCM13-00129
| GCM-Final | 6/3/2013 | 5/31/2013 | 6/3/2013 11:59:59 AM | P | CANC |
|
|
Eric ###-####...per barb
|
GCM13-00112
| GCM-Final | 6/3/2013 | 5/31/2013 | 6/3/2013 11:58:35 AM | A | CANC |
|
|
April ###-####...already done
|
MIS12-00326
| MIS-Aging Inspection | 5/31/2013 | 5/31/2013 | 6/3/2013 10:14:11 AM | A | PASS |
|
|
will check on job
|
MEC13-01871
| Final | 5/30/2013 | 5/31/2013 | 5/31/2013 8:36:58 AM | P | FAIL |
|
|
1:30 meet owner,,,need to call contractor about comb air
|
ESC13-00507
| Site Preparation | 5/31/2013 | 5/31/2013 | | | |
|
|
|