BLD14-03207
| BLD-Conference | 5/24/2016 | 5/24/2016 | | P | |
|
|
Mech has approved CW Shell and Core Restrooms, 2, 3, 4, 5, 6. Ready for cover. Check assembly at North Wall, Women''s Restroom at 7th Floor. akj.
Call on your way over, we can start at 7 and work down. Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD14-03207
| BLD-Conference | 5/25/2016 | 5/26/2016 | | P | |
|
|
Shell and Core restrooms 2,3,4,5,6,8 ready for ceiling cover. akj Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD16-00471
| BLD-Other | 5/25/2016 | 5/31/2016 | 6/1/2016 7:40:29 AM | A | CANC |
|
|
bulding permit list this project as a type A-1 and requires inspection of our erosion control plan. i did not see this as an option on the drop down menu so i selected the BLD-other option for tuesday may 31st AM Phone #: ###-#### Inspection requested via web by trevor johnson
|
BLD15-03621
| BLD-Wall Bracing | 5/27/2016 | 5/31/2016 | 6/1/2016 7:39:23 AM | P | PART |
|
|
Joel Phone #: ###-#### pareppit along 10th street ok
|
BLD14-02889
| BLD-Energy code compliance | 5/30/2016 | 5/31/2016 | 6/1/2016 6:39:22 AM | P | PASS |
|
|
Energy code compliance west corridor exterior walls level''s 4, 5, ; 6. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD15-00087
| BLD-Final | 5/31/2016 | 5/31/2016 | 5/31/2016 3:03:31 PM | P | PASS |
|
|
Mike Phone #: ###-####
|
BLD15-00087
| DOC - Permit Finaled | 5/31/2016 | 5/31/2016 | 5/31/2016 3:03:20 PM | P | PASS |
|
|
|
BLD14-02889
| BLD-Framing/Rough-in | 5/30/2016 | 5/31/2016 | 5/31/2016 2:43:11 PM | P | CANC |
|
|
Foam and framing 6th floor. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
|
BLD15-04136
| BLD-Energy code compliance | 5/27/2016 | 5/31/2016 | 5/31/2016 2:38:10 PM | P | NR |
|
|
Mark Phone #: ###-####
|
BLD16-01620
| BLD-Footing | 5/31/2016 | 5/31/2016 | 5/31/2016 2:27:04 PM | P | FAIL |
|
|
Zack Phone #: ###-#### not to plans
|
BLD15-03818
| BLD-Conference | 5/31/2016 | 5/31/2016 | 5/31/2016 2:12:19 PM | P | PART |
|
|
Clay// please call before the home is hard to find Phone #: ###-#### needs to add two studa under lvl on ext wall
|
BLD16-00607
| BLD-Final | 5/31/2016 | 5/31/2016 | 5/31/2016 1:56:58 PM | P | PASS |
|
|
verify demo Phone #: ###-####
|
BLD16-00607
| DOC - Permit Finaled | 5/31/2016 | 5/31/2016 | 5/31/2016 1:56:47 PM | P | PASS |
|
|
|
BLD15-03172
| BLD-Framing/Rough-in | 5/31/2016 | 5/31/2016 | 5/31/2016 1:51:38 PM | P | PASS |
|
|
Please call ahead for access, or leave message with questions - Ryan Phone #: ###-#### k to insulate after elec rough in
|
BLD15-03105
| BLD-Final | 5/31/2016 | 5/31/2016 | 5/31/2016 1:26:43 PM | P | PASS |
|
|
Erin Phone #: ###-####
|
BLD15-03105
| DOC - Permit Finaled | 5/31/2016 | 5/31/2016 | 5/31/2016 1:26:33 PM | P | PASS |
|
|
|
BLD16-00027
| BLD-Final | 5/27/2016 | 5/31/2016 | 5/31/2016 10:35:52 AM | A | PASS |
|
|
Rob Phone #: ###-####
|
BLD14-02173
| BLD-Framing/Rough-in | 5/27/2016 | 5/31/2016 | 5/31/2016 10:25:50 AM | A | PASS |
|
|
John-ceiling-John said inspection has nothing to do with the plan mod that''s in review Phone #: ###-#### second floor ok
|
BLD16-00244
| BLD-Wall Bracing | 5/27/2016 | 5/31/2016 | 5/31/2016 9:57:55 AM | A | PASS |
|
|
Bob Phone #: ###-####
|
GCB15-00133
| GCB-Energy | 5/27/2016 | 5/31/2016 | 5/31/2016 9:22:16 AM | A | PASS |
|
|
Mike ###-####
|