ELE17-01235
| Final | 5/31/2017 | 5/31/2017 | 5/31/2017 2:24:34 PM | P | PASS |
|
|
Owners should be home Phone #: ###-#### Inspection requested via web by cal crosby...
ok to final
|
ELE17-01534
| Conference | 5/25/2017 | 5/31/2017 | 5/31/2017 2:01:54 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kevin Colgrove...
checked listing and labelling of all equipment, discussed grounding and bonding, wire sizing, breaker sizing and location in panel, and distribution panel and disconnect location...home owner very knowledgeable
|
ELE17-00022
| Final | 5/30/2017 | 5/31/2017 | 5/31/2017 9:55:59 AM | A | PASS |
|
|
DEAN IS THE CONTACT Phone #: ###-#### Inspection requested via web by Lori Stout...
ok to final
|
ELE17-01643
| Electrical Rough-In | 5/30/2017 | 5/31/2017 | 5/31/2017 9:22:41 AM | A | PASS |
|
|
Mucho Phone #: ###-####...
expansion off existing room circuit....ok to cover
|
ELE17-01640
| Final | 5/30/2017 | 5/31/2017 | 5/31/2017 8:50:08 AM | A | CANC |
|
|
Brent Phone #: ###-####...
wrong inspection scheduled...needed perm service inspection...will need to schedule final once power is turned on
|
ELE17-01640
| Permanent Service | 5/31/2017 | 5/31/2017 | 5/31/2017 8:48:35 AM | P | PASS |
|
|
Brent Phone #: ###-####...
p/s o/h n ok
|
ELE17-01503
| Electrical Rough-In | 5/30/2017 | 5/31/2017 | 5/31/2017 8:20:51 AM | A | PASS |
|
|
Please call Lynn at ###-#### for directions on what we need inspected. Phone #: ###-#### Inspection requested via web by Lynn Proctor....
new walls ok to cover, above new panels ok to cover
|