FIR17-00120
| INSP-Supply line flush | 5/31/2017 | 5/31/2017 | 5/31/2017 2:11:17 PM | P | PASS |
|
|
Under ground supply line flush passed
|
BLD17-00177
| FIRE-Final Inspection | 5/31/2017 | 5/31/2017 | 5/31/2017 1:43:33 PM | P | PASS |
|
|
Life safety passed. Non-sprinklered building and construction did not appear to effect the existing fire alarm system
|
FIR16-00664
| INSP-Final Inspection | 5/31/2017 | 5/31/2017 | 5/31/2017 1:37:41 PM | P | CANC |
|
|
Selonoid has not been installed yet.
Call Anthony when heading out. Thanks. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
BLD17-01539
| FIRE-Final Inspection | 5/30/2017 | 5/31/2017 | 5/31/2017 10:31:09 AM | A | PASS |
|
|
life safety passed
|
FIR17-00080
| INSP-Sprinkler Rough-in/Hydro | 5/30/2017 | 5/31/2017 | 5/31/2017 10:13:07 AM | A | PASS |
|
|
The underground and system #2 hydro tests passed
|
FIR17-00143
| INSP-Final Inspection | 5/30/2017 | 5/31/2017 | 5/31/2017 10:01:22 AM | A | FAIL |
|
|
Need actual full size drawings, notes and data sheets, need a clear panel, per approved drawings alarm, trouble and supervisory signals report off site. Per the tech only alarms report off site.
|
FIR17-00097
| INSP-Final Inspection | 5/30/2017 | 5/31/2017 | 5/31/2017 9:58:15 AM | A | CANC |
|
|
Fire alarm system not ready so no testing was performed. I let mike know we will need a forward flush test performed.
|
FIR16-00557
| INSP-Final Inspection | 5/30/2017 | 5/31/2017 | 5/31/2017 9:09:47 AM | A | FAIL |
|
|
All items appear ok except the fan in the Truck Bay is an obstruction and the forward flow test failed.
|
FIR16-00392
| INSP-Final Inspection | 5/30/2017 | 5/31/2017 | 5/31/2017 9:08:56 AM | A | FAIL |
|
|
All items tested ok except that the fan in the Truck Bay will need to be shut down upon flow of water. Resubmittals or as-builts will be required at the plan reviewers request.
|