Inspections for the day of: Friday, May 31, 2019.
Number of inspections: 13
Percentage of inspections complete: 77 %
Percentage of inspections not complete: 23 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00020 General Inspection5/29/20195/29/2019 P 
post rainfall inspection
ESC18-00109 General Inspection5/30/20195/30/2019   
ESC18-01188 Site Final5/23/20195/31/20196/4/2019 11:15:07 AMPPASS
Home complete, landscaped and occupied. No temporary BMPs installed. ESC permit finaled.
ESC17-00842 BMP Violation5/28/20195/31/20196/3/2019 5:00:23 PMPPASS
follow up inspection

Silt fence installed along the front of site as requested. No new correction requests at this time.
ESC19-00324 Site Preparation5/30/20195/31/20196/3/2019 2:00:59 PMAPASS
check for construction entrance


Construction entrance is installed per installation details. Crew is in progress rough grading, water truck arrived on site for dust control at time of inspection. Access road is source of dust and was dried out.

Front slope to the right of the entrance is now disturbed. Site needs to install a silt fence at toe of slope along the entrance to prevent runoff at the entrance.

Verbal request to Granite project manager Terrel 2083152350
ESC18-00181 Aging Inspection5/31/20195/31/20196/3/2019 8:19:43 AM CANC
ESC18-00192 Aging Inspection5/31/20195/31/20195/31/2019 12:15:04 PM PASS
ESC18-00192 DOC - Permit Finaled5/31/20195/31/20195/31/2019 12:14:55 PMPPASS
ESC18-00240 Aging Inspection5/31/20195/31/20195/31/2019 12:14:43 PM PASS
ESC19-00365 General Inspection5/31/20195/31/20195/31/2019 10:41:45 AMPPASS
WIP at Dog Island.

All ecoblocks and ramps are installed. Crews working installing culvert from pond outflow to Amercan. Large capacity pump was not working, and is only used to deal when pond levels rise. Smaller pumps are discharging to grass for infiltration. Water in outlet is clear with no turbidity.

Work area clean, concrete washout utilized. No corrections requested. Spoke with RP Travis and onsite manager Abel
ESC18-01603 Site Final5/31/20195/31/20195/31/2019 10:39:20 AMPPASS
Suez pump house project complete. Access road improved to prevent muddy trackout. No disturbed area or temporary BMPs left on site. Approved
ESC18-00369 Aging Inspection5/31/20195/31/20195/31/2019 8:26:43 AM CANC
ESC17-00791 BMP Violation5/29/20195/31/2019 A