ELE00-00735
| Final | 5/3/2000 | 5/4/2000 | 5/4/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/03/2000 at 07:27:09. Contact: ###-####. CORRECTION POSTED CALLED MESSAGE SAID NO SERVICE NEEDS TO PROTECT CABLE AND INSTALL PROPER SIZE BOX ISLAND COUNTER 5/4/00 3:17:15 PM
|
ELE00-01330
| Electrical Rough-In | 5/3/2000 | 5/4/2000 | 5/4/2000 12:00:00 AM | A | PART |
|
|
UNDERGROUND ###-#### OK CALLED CURT ABOUT CONDUIT, THAT MIGHT BE DAMAGED 5/4/00 3:19:17 PM
|
ELE00-01583
| Permanent Service | 5/3/2000 | 5/4/2000 | 5/4/2000 12:00:00 AM | A | FAIL |
|
|
###-#### called see jf for detail 5/5/00 11:45:16 AM
|
ELE00-01570
| Permanent Service | 5/3/2000 | 5/4/2000 | 5/4/2000 12:00:00 AM | A | PART |
|
|
###-#### this was done by 336 5/5/00 11:44:54 AM
|
ELE00-00970
| Final | 5/3/2000 | 5/4/2000 | 5/4/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/03/2000 at 16:19:18. Contact: ###-####. CORRECTION POSTED TALKED WITH CONTRACTOR 5/4/00 3:18:13 PM
|
ELE00-01411
| Electrical Rough-In | 5/4/2000 | 5/4/2000 | 5/4/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
ELE00-01591
| Rough-In Permanent Service | 5/4/2000 | 5/4/2000 | 5/4/2000 12:00:00 AM | P | PASS |
|
|
clyde--###-#### r/i & ser p/s u/g n 5/5/00 11:46:06 AM
|
ELE00-01154
| Rough-In Permanent Service | 5/4/2000 | 5/4/2000 | 5/4/2000 12:00:00 AM | P | PASS |
|
|
###-#### already done 5/5/00 11:45:41 AM
|
ELE99-03739
| Final | 5/4/2000 | 5/4/2000 | 5/4/2000 12:00:00 AM | P | NR |
|
|
###-#### called 5/5/00 11:46:27 AM
|
ELE00-01543
| Temporary Service | 5/4/2000 | 5/4/2000 | 5/4/2000 12:00:00 AM | P | PASS |
|
|
###-#### u/g n 5/8/00 6:53:49 AM
|