ELE00-01501
| Rough-In Permanent Service | 5/1/2000 | 5/4/2000 | 5/4/2000 12:00:00 AM | A | PASS |
|
|
###-#### Ele. R/I perm./svc. 5/4/00 4:53:46 PM
|
ELE00-01499
| Electrical Rough-In | 5/1/2000 | 5/4/2000 | 5/4/2000 12:00:00 AM | A | PASS |
|
|
###-#### Ele. R/I; perm./svc 5/4/00 4:53:54 PM
|
ELE00-01327
| Electrical Rough-In | 5/3/2000 | 5/4/2000 | 5/4/2000 12:00:00 AM | A | CANC |
|
|
TED ALLEN ###-#### CALL FIRST TO MEET FOR CONFERENCE Owner will reschedule. 5/4/00 4:54:03 PM
|
ELE00-01487
| Electrical Rough-In | 5/3/2000 | 5/4/2000 | 5/4/2000 12:00:00 AM | A | PASS |
|
|
FRANK----###-#### R/I Corrections completed 5/4/00 4:54:11 PM
|
ELE00-00551
| Electrical Rough-In | 5/3/2000 | 5/4/2000 | 5/4/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/03/2000 at 16:43:38. Contact: ###-####. Northend walls; ele R/I; 4 offices. 5/4/00 4:53:36 PM
|
ELE00-01556
| Electrical Rough-In | 5/4/2000 | 5/4/2000 | 5/4/2000 12:00:00 AM | A | FAIL |
|
|
No access; left card, no answer on message phone.
|
ELE00-01556
| Electrical Rough-In | 5/3/2000 | 5/4/2000 | 5/4/2000 12:00:00 AM | P | PART |
|
|
###-#### WENDY AFTER 3PM Conference; code requirements, branch circuits. 5/5/00 10:20:39 AM
|
ELE00-01343
| Temporary Service | 5/4/2000 | 5/4/2000 | 5/4/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/04/2000 at 07:56:06. Contact: ###-####. Temp. service 5/5/00 10:21:24 AM
|
ELE00-01508
| Final | 5/4/2000 | 5/4/2000 | 5/4/2000 12:00:00 AM | P | FAIL |
|
|
###-#### Jake King Calculated service load request not performed 5/5/00 10:20:55 AM
|
ELE00-01590
| Final | 5/4/2000 | 5/4/2000 | 5/4/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/04/2000 at 10:10:28. Contact: ###-####. 5th floor; electrical door controls. 5/5/00 10:21:16 AM
|