PLM01-01182
| Groundwork | 5/3/2001 | 5/4/2001 | 5/4/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/03/2001 at 15:48:16. Contact: . sewer from bld to 1st tank ackgraded 5/7/2001 11:35:09 AM
|
PLM01-01392
| Plumbing Rough-in | 5/3/2001 | 5/4/2001 | 5/4/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/03/2001 at 16:25:17. Contact: ###-####. waste test failed, provide a guage for water system test. 5/4/2001 9:18:31 AM
|
PLM00-03202
| Groundwork | 5/4/2001 | 5/4/2001 | 5/4/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/04/2001 at 06:14:12. Contact: ###-####. 8" rd east side center ok 5/4/2001 3:54:37 PM
|
PLM00-03700
| Water and/or Sewer | 5/3/2001 | 5/4/2001 | 5/4/2001 12:00:00 AM | A | FAIL |
|
|
Bill cook ###-#### sewer only at this time mandral stuck 5/4/2001 3:53:22 PM
|
PLM01-01339
| Roof Drains | 5/3/2001 | 5/4/2001 | 5/4/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/03/2001 at 15:34:40. Contact: ###-####.
|
PLM00-02912
| Groundwork | 5/4/2001 | 5/4/2001 | 5/4/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/04/2001 at 09:58:41. Contact: ###-####. floor sink, rd stub out east side by foundation wall test ok 5/4/2001 3:56:15 PM
|
PLM01-01392
| Plumbing Rough-in | 5/4/2001 | 5/4/2001 | 5/4/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 05/04/2001 at 10:05:37. Contact: ###-####.
|
PLM00-03700
| Water and/or Sewer | 5/4/2001 | 5/4/2001 | 5/4/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 5/4/2001 3:54:07 PM upper section mandral and air test ok
|
PLM00-03202
| Groundwork | 5/4/2001 | 5/4/2001 | 5/4/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 5/4/2001 3:55:22 PM sewer stubed out an additional 15' test ok
|