ELE00-04272
| Final | 5/3/2001 | 5/4/2001 | 5/4/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/03/2001 at 12:46:19. Contact: ###-####.
|
ELE01-01404
| Permanent Service | 5/3/2001 | 5/4/2001 | 5/4/2001 12:00:00 AM | A | PART |
|
|
Wayne ###-#### P/S O/H R Ok for Power requires bonding hot and cold and 2nd ground rod and final inspection after changeover 5/4/2001 10:01:50 AM
|
ELE01-01435
| Electrical Rough-In | 5/3/2001 | 5/4/2001 | 5/4/2001 12:00:00 AM | A | PART |
|
|
conference only John ###-#### P/S U/G R Ok for power only requires future inspection of grounding 5/4/2001 9:13:31 AM
|
ELE00-04817
| Final | 5/3/2001 | 5/4/2001 | 5/4/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/03/2001 at 14:48:30. Contact: ###-####.
|
ELE01-01025
| Electrical Rough-In | 5/3/2001 | 5/4/2001 | 5/4/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/03/2001 at 16:29:14. Contact: ###-####. 680-10 depth of conduit within 5 feet of pool 5/4/2001 10:22:26 AM
|
ELE01-01450
| Temporary Service | 5/4/2001 | 5/4/2001 | 5/4/2001 12:00:00 AM | P | PASS |
|
|
Roger ###-#### reinspection T/S U/G N Ok 5/4/2001 2:45:44 PM
|
ELE01-00374
| Final | 5/4/2001 | 5/4/2001 | 5/4/2001 12:00:00 AM | P | FAIL |
|
|
###-#### pager 7072981 will be open GFCI protection in garage 4 wire to dryer open J box 5/4/2001 3:25:53 PM
|
ELE01-01451
| Electrical Rough-In | 5/4/2001 | 5/4/2001 | 5/4/2001 12:00:00 AM | P | PASS |
|
|
late pm please Paul ###-####
|
ELE01-01435
| Rough-In Permanent Service | 5/2/2001 | 5/4/2001 | 5/4/2001 12:00:00 AM | P | PART |
|
|
###-####
|