Inspections for the day of: Friday, May 4, 2001.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Arcoraci
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01029 BLD-Final5/1/20015/4/20015/4/2001 12:00:00 AMANR
lerice--- ###-#### fn for homeowner
BLD01-00686 BLD-Framing/Rough-in5/3/20015/4/20015/4/2001 12:00:00 AMAPART
shear ###-####- walt ok to side needs retro fit hd at front window north side 5/4/2001 10:48:27 AM
BLD01-00831 BLD-Footing5/3/20015/4/20015/4/2001 12:00:00 AMAPART
ft- ###-#### -douglas wip 5/4/2001 11:01:59 AM
BLD01-00968 BLD-Framing/Rough-in5/3/20015/4/20015/4/2001 12:00:00 AMAPASS
Larry ###-####
MIS01-00072 BLD-Final5/3/20015/4/20015/4/2001 12:00:00 AMAPART
Scott ###-#### ok to skirt 5/4/2001 11:47:58 AM
BLD01-00772 BLD-Wall cover5/3/20015/4/20015/4/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 05/03/2001 at 16:04:41. Contact: ###-####. ok to side 5/4/2001 9:53:10 AM
BLD01-00092 BLD-Final5/3/20015/4/20015/4/2001 12:00:00 AMANR
Scheduled by a contractor via Hello! on 05/03/2001 at 16:09:47. Contact: ###-####.
BLD01-01029 BLD-Framing/Rough-in5/4/20015/4/20015/4/2001 12:00:00 AMAPART
Added by Inspector: 408 On 5/4/2001 10:30:00 AM ok to cover after elec insp
BLD00-01744 BLD-Conference5/4/20015/4/20015/4/2001 12:00:00 AMPPASS
Added by Inspector: 408 On 5/4/2001 3:02:44 PM wip curtian wall and f/p of steel
BLD01-00935 BLD-Final5/4/20015/4/20015/4/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 05/04/2001 at 09:11:36. Contact: ###-####.
BLD01-00292 BLD-Framing/Rough-in5/4/20015/4/20015/4/2001 12:00:00 AMPPART
###-#### wip 5/4/2001 1:32:55 PM
BLD00-02283 BLD-Footing5/3/20015/4/20015/4/2001 12:00:00 AMPPASS
###-####
BLD01-01162 BLD-Final5/3/20015/4/20015/4/2001 12:00:00 AMPPASS
250*-5372 installed wo insp appears ok 5/4/2001 1:54:23 PM
BLD00-02302 BLD-Foundation5/2/20015/4/20015/4/2001 12:00:00 AMPPASS
###-####