BLD02-02514
| BLD-Framing/Rough-in | 4/27/2004 | 4/27/2004 | | P | |
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD03-02626
| BLD-Conference | 5/3/2004 | 5/4/2004 | 5/4/2004 12:00:00 AM | A | PASS |
|
|
kevin; phone# ###-####,,, verify elec. pass on furnace
|
BLD04-00934
| BLD-Final | 5/3/2004 | 5/4/2004 | 5/4/2004 12:00:00 AM | A | PASS |
|
|
jack- ###-####
|
BLD04-00177
| BLD-Footing | 5/3/2004 | 5/4/2004 | 5/4/2004 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 5/3/2004 at 7:05:34 PM. Contact: ###-####.
WIP ON GARAGE FTGS AND CRAWL FTGS 5/4/2004 9:22:02 AM
|
BLD04-00273
| BLD-Wall cover | 5/4/2004 | 5/4/2004 | 5/4/2004 12:00:00 AM | P | FAIL |
|
|
can you make time to do preliminary walk through for framing rough in; Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
need to nail shear per plan,,,, shear insp. only 5/4/2004 1:41:53 PM
|
BLD03-02382
| BLD-Conference | 5/3/2004 | 5/4/2004 | 5/4/2004 12:00:00 AM | P | PART |
|
|
bob- ###-####
on final 5/4/2004 3:11:22 PM
|
BLD04-00659
| BLD-Energy code compliance | 5/3/2004 | 5/4/2004 | 5/4/2004 12:00:00 AM | P | PASS |
|
|
PJ ###-####, call first please to make sure they're ready. thanks.
|
BLD04-00222
| BLD-Conference | 4/30/2004 | 5/4/2004 | | A | |
|
|
check on permit progress
|