ELE05-01459
| Permanent Service | 5/3/2005 | 5/4/2005 | 5/4/2005 12:00:00 AM | A | PASS |
|
|
edward ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
P/S O/H R Ok
Unboot 5/4/2005 10:16:34 AM
|
ELE03-02903
| Electrical Rough-In | 5/3/2005 | 5/4/2005 | 5/4/2005 12:00:00 AM | A | PART |
|
|
We are ready for a rough-in inspection for apartment #917. Jason will meet you at 8:30 AM. Thanks!!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|
ELE05-01538
| Electrical Rough-In | 5/3/2005 | 5/4/2005 | 5/4/2005 12:00:00 AM | A | PASS |
|
|
need bonding inspection on swimming pool Internet Inspection Request from: Andy Rose
bonding ok 5/4/2005 9:51:26 AM
|
ELE05-01539
| Electrical Rough-In | 5/3/2005 | 5/4/2005 | 5/4/2005 12:00:00 AM | A | NR |
|
|
###-#### - paul
Had conf.
2in riser on service
grounding or removing metal extension rings 5/4/2005 9:54:13 AM
|
ELE04-02998
| Final | 5/4/2005 | 5/4/2005 | 5/4/2005 12:00:00 AM | P | FAIL |
|
|
eric; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
ground poles at hand hole 5/4/2005 2:08:12 PM
|
ELE05-00800
| Final | 5/4/2005 | 5/4/2005 | 5/4/2005 12:00:00 AM | P | PASS |
|
|
eric; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
ELE04-04022
| Electrical Rough-In | 5/4/2005 | 5/4/2005 | 5/4/2005 12:00:00 AM | P | PART |
|
|
###-####. Scheduled by a contractor via Hello! on 5/4/2005 at 8:27:07 AM. Contact: ###-####. 5/4/2005 11:34:06 AM
partial U/G Ok
14 runs to be located and pot holed 5/4/2005 2:57:59 PM
|
ELE04-03826
| Final | 5/4/2005 | 5/4/2005 | 5/4/2005 12:00:00 AM | P | PASS |
|
|
###-#### brian
P/S O/H R OK 5/4/2005 3:32:46 PM
|
ELE05-01549
| Temporary Service | 5/4/2005 | 5/4/2005 | 5/4/2005 12:00:00 AM | P | FAIL |
|
|
###-#### paul
250.24 electrode to grounding bus
110.3 homline breaker not approved for this panel 5/4/2005 4:18:47 PM
|