FIR06-00217
| INSP-Final Inspection | 5/4/2006 | 5/4/2006 | 5/4/2006 5:04:04 PM | P | PART |
|
|
Permitted work is complete, however the installation will not function as designed until the partition seperation from wall to ceiling is constructed between the sprinklers.
|
FIR06-00267
| INSP-Final Inspection | 5/3/2006 | 5/4/2006 | 5/4/2006 4:45:49 PM | P | PASS |
|
|
Fire alarm work passed field inspection, server room notification to be installed and verified at inspection for the adjacent TI area as agreed.
|
FIR05-00719
| INSP-Final Inspection | 5/4/2006 | 5/4/2006 | 5/4/2006 2:06:30 PM | P | FAIL |
|
|
At the time of inspection (approx. 1:30 pm) the required corrections had not been made.
|
FIR06-00245
| INSP-Final Inspection | 5/4/2006 | 5/4/2006 | 5/4/2006 2:04:37 PM | A | NR |
|
|
Panel must be free of ground fault condition prior to final alarm testing.
|
FIR05-00811
| INSP-Final Inspection | 4/27/2006 | 5/4/2006 | 5/4/2006 12:15:50 PM | A | PASS |
|
|
The required corrections have been made, fire sprinkler permit finaled.
|
BLD05-03401
| FIRE-Final Inspection | 4/27/2006 | 5/4/2006 | 5/4/2006 12:13:39 PM | A | FAIL |
|
|
The project related alarm and sprinkler permits must be finaled prior to BLD life safety final, doors at some locations are not installed, one set of egress doors are blocked by an office cubicle, project is not ready for final inspection at this time.
|
FIR05-00865
| INSP-Final Inspection | 4/27/2006 | 5/4/2006 | 5/4/2006 12:10:43 PM | A | FAIL |
|
|
Need to provide smoke detection at the double doors for release of mag locks per NFPA 72 2002, audibility appears to be inadequate at some locations as discussed and noted on plan review documents. Damper smoke detection, pull stations, EOL, and visual notification tested okay.
|
FIR05-00864
| INSP-Final Inspection | 4/27/2006 | 5/4/2006 | 5/4/2006 12:05:11 PM | A | FAIL |
|
|
The overhead sprinkler piping has been completely concealed prior to inspection for cover, it will be necessary to expose the installation for verification of code compliance. Also noted two heads at a confrence room which are spaced incorrectly.
|
FIR05-00719
| INSP-Final Inspection | 5/3/2006 | 5/4/2006 | 5/4/2006 8:57:59 AM | A | FAIL |
|
|
Need to install ceiling tile and escutcheon at one location, install partition between wall and cooler as discussed, one head at the service counter does not match the temp. and response of the remainder of heads in the fire area.
|
BLD05-03448
| FIRE-Conference | 5/3/2006 | 5/4/2006 | 5/4/2006 8:54:12 AM | A | NR |
|
|
Field inspection to be scheduled for 5/5 in the AM as agreed.
|
BLD05-02358
| FIRE-Final Inspection | 5/3/2006 | 5/4/2006 | 5/4/2006 8:51:05 AM | A | DONE |
|
|
Duplicate inspection request already completed.
|
BLD05-02358
| FIRE-Final Inspection | 5/3/2006 | 5/4/2006 | 5/4/2006 8:50:11 AM | A | PASS |
|
|
Project related alarm and sprinkler permits have been finaled, fire life safety passed inspection.
|
FIR05-00681
| INSP-Final Inspection | 5/3/2006 | 5/4/2006 | 5/4/2006 8:48:45 AM | A | PASS |
|
|
Overhead fire sprinkler work is satisfactory, permit finaled.
|