Inspections for the day of: Thursday, May 4, 2006.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00217 INSP-Final Inspection5/4/20065/4/20065/4/2006 5:04:04 PMPPART
Permitted work is complete, however the installation will not function as designed until the partition seperation from wall to ceiling is constructed between the sprinklers.
FIR06-00267 INSP-Final Inspection5/3/20065/4/20065/4/2006 4:45:49 PMPPASS
Fire alarm work passed field inspection, server room notification to be installed and verified at inspection for the adjacent TI area as agreed.
FIR05-00719 INSP-Final Inspection5/4/20065/4/20065/4/2006 2:06:30 PMPFAIL
At the time of inspection (approx. 1:30 pm) the required corrections had not been made.
FIR06-00245 INSP-Final Inspection5/4/20065/4/20065/4/2006 2:04:37 PMANR
Panel must be free of ground fault condition prior to final alarm testing.
FIR05-00811 INSP-Final Inspection4/27/20065/4/20065/4/2006 12:15:50 PMAPASS
The required corrections have been made, fire sprinkler permit finaled.
BLD05-03401 FIRE-Final Inspection4/27/20065/4/20065/4/2006 12:13:39 PMAFAIL
The project related alarm and sprinkler permits must be finaled prior to BLD life safety final, doors at some locations are not installed, one set of egress doors are blocked by an office cubicle, project is not ready for final inspection at this time.
FIR05-00865 INSP-Final Inspection4/27/20065/4/20065/4/2006 12:10:43 PMAFAIL
Need to provide smoke detection at the double doors for release of mag locks per NFPA 72 2002, audibility appears to be inadequate at some locations as discussed and noted on plan review documents. Damper smoke detection, pull stations, EOL, and visual notification tested okay.
FIR05-00864 INSP-Final Inspection4/27/20065/4/20065/4/2006 12:05:11 PMAFAIL
The overhead sprinkler piping has been completely concealed prior to inspection for cover, it will be necessary to expose the installation for verification of code compliance. Also noted two heads at a confrence room which are spaced incorrectly.
FIR05-00719 INSP-Final Inspection5/3/20065/4/20065/4/2006 8:57:59 AMAFAIL
Need to install ceiling tile and escutcheon at one location, install partition between wall and cooler as discussed, one head at the service counter does not match the temp. and response of the remainder of heads in the fire area.
BLD05-03448 FIRE-Conference5/3/20065/4/20065/4/2006 8:54:12 AMANR
Field inspection to be scheduled for 5/5 in the AM as agreed.
BLD05-02358 FIRE-Final Inspection5/3/20065/4/20065/4/2006 8:51:05 AMADONE
Duplicate inspection request already completed.
BLD05-02358 FIRE-Final Inspection5/3/20065/4/20065/4/2006 8:50:11 AMAPASS
Project related alarm and sprinkler permits have been finaled, fire life safety passed inspection.
FIR05-00681 INSP-Final Inspection5/3/20065/4/20065/4/2006 8:48:45 AMAPASS
Overhead fire sprinkler work is satisfactory, permit finaled.