Inspections for the day of: Thursday, May 4, 2006.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-03391 FIRE-Conference5/4/20065/4/20065/4/2006 4:06:12 PMPDONE
Contractor requested the use of the finished areas of the church while construction continued in the recreation area. Dave Hanneman agreed as long as all life safety items had been completed in the areas to be occupied. At this point the project is not ready for inspection.
FIR06-00229 INSP-Sprinkler Rough-in/Hydro5/4/20065/4/20065/4/2006 3:06:19 PMPPASS
Permit is ok to final when the fire alarm permit is finaled.
FIR05-00869 INSP-Final Inspection5/3/20065/4/20065/4/2006 2:56:36 PMAPASS
Per email from Sam Rogers the existing location of the manual pull staions is approved. Permit finaled.
BLD05-03414 FIRE-Final Inspection5/3/20065/4/20065/4/2006 1:50:48 PMAFAIL
Provide fire hydrant per notes and drawing sheet A.1, repair exit sign and provide annual inspection tag for the fire extinguisher
BLD04-01977 BLD-Aging Inspection5/4/20065/4/20065/4/2006 9:43:46 AM NR
Per the General Contractor the inspection will be called in for tomorrow afternoon since nobody is there today.
BLD06-00430 FIRE-Alarm Testing5/2/20065/4/20065/4/2006 9:39:50 AMAFAIL
No approved drawings on site. I pointed out that the existing exit sign was burnt out. The fire alarm permit has been finaled.
FIR06-00221 INSP-Sprinkler Rough-in/Hydro5/2/20065/4/20065/4/2006 7:53:35 AMAPASS
Fire alarm permit finaled
FIR06-00229 INSP-Sprinkler Rough-in/Hydro5/3/20065/4/20065/4/2006 12:00:00 AMACANC
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles reshedule for pm