Inspections for the day of: Friday, May 4, 2007.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00196 INSP-Sprinkler Rough-in/Hydro5/4/20075/4/20075/4/2007 5:01:30 PMPPASS
Hydro test on the anti-freeze system passed. Rough in got a partial on the anti freeze system. Plans and hydraulic calculations will need to be resubmitted due to the changes in this area. I also let the general contractor know that the wall pockets will require sprinkler protection or meet the combustible concealed space requirements of NFPA 13. Per phone call from the architect it sounds like sheet rock will be installed to cover the wood which will be ok.
BLD06-03284 FIRE-Final Inspection5/3/20075/4/20075/4/2007 4:58:32 PMAPART
A temporary occupancy was given by dave hanniman for the new areas to be occupied while the fire alarm and fire sprinkler systems are finished being installed. Life safety can be passed when these permits are finaled
FIR06-00570 INSP-Final Inspection5/4/20075/4/20075/4/2007 4:57:43 PMPPART
A temporary occupancy was given by dave hanniman for the new areas to be occupied while the fire alarm and fire sprinkler systems are finished being installed.
FIR06-00485 INSP-Final Inspection5/4/20075/4/20075/4/2007 4:57:15 PMPPART
A temporary occupancy was given by dave hanniman for the new areas to be occupied while the fire alarm and fire sprinkler systems are finished being installed.
FIR07-00232 INSP-Final Inspection5/4/20075/4/20075/4/2007 4:56:37 PMPPART
A temporary occupancy was given by dave hanniman for the new areas to be occupied while the fire alarm and fire sprinkler systems are finished being installed.
FIR07-00223 INSP-Final Inspection5/4/20075/4/20075/4/2007 2:02:30 PMPPASS
permit finaled
FIR07-00389 INSP-Final Inspection5/4/20075/4/20075/4/2007 1:12:53 PMPCANC
To be rescheduled for monday.
FIR07-00421 INSP-Final Inspection5/4/20075/4/20075/4/2007 1:08:17 PMPFAIL
The hood suppression system operated correctly but panels will need to be installed on both sides of the fryers for the 18" separation.
FIR07-00308 INSP-Sprinkler Rough-in/Hydro5/3/20075/4/20075/4/2007 11:49:23 AMAPASS
Hydro test for the new system passed. A cracked fitting was to blame.
BLD07-00186 FIRE-Final Inspection5/3/20075/4/20075/4/2007 11:02:31 AMAPASS
life safety passed. The fire alarm work shown on the plans is existing
FIR07-00396 INSP-Final Inspection5/3/20075/4/20075/4/2007 9:53:16 AMAPASS
permit finaled
FIR06-00485 INSP-Final Inspection5/4/20075/4/20075/4/2007 9:21:36 AMPCANC
Phone #: ###-#### Internet Inspection Request from: Jeff Packham Inspection cancelled from web by: Jeff Packham
FIR07-00232 INSP-Final Inspection5/4/20075/4/20075/4/2007 9:19:47 AMPCANC
Phone #: ###-#### Internet Inspection Request from: Jeff Packham Inspection cancelled from web by: Jeff Packham
FIR05-00536 INSP-Sprinkler Rough-in5/3/20075/4/20075/4/2007 9:00:31 AMAPASS
See the city approved plans for piping located in the basement and the eighth floor that is ok to cover.