Inspections for the day of: Monday, May 4, 2009.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Kinnear
TitleELE-INSPECTOR
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE09-00746 Final5/4/20095/4/20095/5/2009 12:03:15 PMPCANC
KEVIN ###-####//please call when on way they to recall inspection for thursday am
ELE09-00745 Final5/4/20095/4/20095/5/2009 12:02:21 PMPCANC
KEVIN ###-####//please call when on way they to recall inspection for thursday am
ELE09-00744 Final5/4/20095/4/20095/5/2009 12:01:33 PMPCANC
KEVIN ###-####//please call when on way need to recall inspection for thursday am
ELE08-03233 Electrical Rough-In5/4/20095/4/20095/4/2009 5:19:59 PMPPART
This will be an underground rough-in inspection.contact will be Rey ###-####.Thanks and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover under ground conduit anop
ELE09-00701 Electrical Rough-In5/4/20095/4/20095/4/2009 5:15:45 PMPCANC
Ceiling inspection onjly Phone #: ###-#### Internet Inspection Request from: Therrin Robertson wrong type inspection
ELE09-00701 Conference5/4/20095/4/20095/4/2009 5:15:23 PMPDONE
Ceiling inspection onjly Phone #: ###-#### Internet Inspection Request from: Therrin Robertson conf regarding low voltage in ceiling & supports for electrical boxes
ESC08-00349 General Inspection5/4/20095/4/20095/4/2009 1:21:23 PMPPASS
sign posted site looks fine
ELE08-02117 Final5/4/20095/4/20095/4/2009 1:20:54 PMPPASS
mike Phone #: ###-#### ok final
ESC09-00154 General Inspection5/4/20095/4/20095/4/2009 12:25:23 PMPPASS
sign posted site looks fine
ELE09-00737 Electrical Rough-In5/4/20095/4/20095/4/2009 12:24:51 PMPPASS
Ed Phone #: ###-#### ok cover walls only
ELE09-00701 Electrical Rough-In5/2/20095/4/20095/4/2009 8:26:56 AMAFAIL
Ceiling inspection request, bank does not open till 9am. Phone #: ###-#### Internet Inspection Request from: Therrin Robertson nec300.11 all wires shall be id. & attached to the grid & structual ceiling. all low voltage wiring shall not be supported by ceiling grid or any electrical equipment. note no esc permit in project