Inspections for the day of: Monday, May 4, 2009.
Number of inspections: 5
Percentage of inspections complete: 80 %
Percentage of inspections not complete: 20 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00349 INSP-Conference4/30/20094/30/2009 P 
Jeff; Phone ###-####
FIR09-00060 FIR-Aging Inspection5/4/20095/4/20095/7/2009 3:42:04 PM NR
Work in progress per Charlie Bayne. He stated work to be completed by the end of this month.
FIR09-00247 INSP-Sprinkler Rough-in5/4/20095/4/20095/4/2009 3:49:03 PMPPART
The rough-in inspection for the piping below the mezzanine passed. An additional inspection will be required when the ceilings and light fixtures have been installed.
BLD09-00106 FIRE-Final Inspection5/4/20095/4/20095/4/2009 1:03:13 PMPPASS
life safety passed
FIR07-00086 INSP-Sprinkler Rough-in/Hydro5/4/20095/4/20095/4/2009 9:13:15 AMAFAIL
I repeadedly tried to contact don by phone and I also wandered the ground and the basement floors looking for the project site.