Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR10-00137 INSP-Final Inspection5/2/20115/3/2011 A 
EARL Phone #: ###-####
BLD11-00043 FIRE-Final Inspection5/4/20115/4/20115/4/2011 5:58:23 PMPPASS
Fire life safety completed acceptable. Okayed for final - Note: Fire sprinkler permit final done although scheduled for 5/5.
FIR11-00127 INSP-Final Inspection5/4/20115/4/20115/4/2011 5:55:04 PMPPASS
Fire alarm work passed inspection. Permit finaled.
BLD11-00362 FIRE-Final Inspection5/3/20115/4/20115/4/2011 5:54:05 PMAPASS
Fire life safety inspection completed acceptable.
FIR10-00583 INSP-Sprinkler Rough-in5/3/20115/4/20115/4/2011 5:53:01 PMAPART
Inspection for cover at hard lid ceilings on the 1st and 2nd floors completed today- See plan annotations for rooms okayed for cover and rooms or areas in need of adjustment including missing coverage at combustible concealed spaces below the stairs, missing coverage at a mech. room 1st floor, blocked upright at the boys restroom 1st floor, min distance between heads at two locations is exceeded, unprotected concealed space at the 2nd floor, possible light fixture obstruction at the east entry vestibule. Rough-in at some areas incomplete at this time.
BLD11-00447 FIRE-Conference5/3/20115/4/20115/4/2011 5:38:13 PMADONE
On site conference with owner regarding project fire life safety conditions, plan review notes, red-line comments, and items needed for occupancy approvals.