ESC09-00352
| General Inspection | 5/4/2011 | 5/4/2011 | 5/4/2011 3:00:34 PM | P | PASS |
|
|
Conditions are unchanged since last inspection. High water has overflow water in Wellings (southwest side) and along the river side of park. River side has cells and sod inplace, so standing water has high degree of water clarity. Informed Brighton and Wetlands that once water level is reduced that stabilization of base ground (Welling Channel) needs to be the highest focus of work performed.
|