Inspections for the day of: Friday, May 4, 2012.
Number of inspections: 14
Percentage of inspections complete: 93 %
Percentage of inspections not complete: 7 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00645 INSP-Conference4/27/20124/27/2012 A 
Contact Brian M.
FIR11-00569 INSP-Conference5/4/20125/4/20125/4/2012 4:45:22 PMPDONE
Regarding final inspection schedule and finished corrections.
BLD11-01032 FIRE-Conference5/4/20125/4/20125/4/2012 4:41:24 PMPDONE
On site discussion with contractor regarding items needed for final fire life safety approvals including fire code review note details such as premise identification, signage at the main entry/exit, PFE locations, max occupant load signs, smoke detection for HVAC units over 2000 cfm, project schedule, etc.
FIR12-00232 INSP-Final Inspection5/3/20125/4/20125/4/2012 4:35:59 PMPPASS
Hood suppression system operated correctly under test conditions. Permit finaled.
FIR12-00013 INSP-Final Inspection5/4/20125/4/20125/4/2012 4:34:32 PMPPASS
UG flush, flow switch test and final walkthrough passed. Permit finaled.
BLD11-00961 FIRE-Final Inspection5/4/20125/4/20125/4/2012 4:32:53 PMPNR
FIR12-00216 INSP-Final Inspection5/4/20125/4/20125/4/2012 2:17:29 PMPFAIL
Coverage at office room 07 is overspaced. Also need to complete hydrostatic testing per review note comments-see NFPA 25 component action replacement table. Remainder of work okayed for cover.
FIR12-00055 INSP-Final Inspection5/4/20125/4/20125/4/2012 12:11:02 PMPPASS
Field verified approved plan modifications on site. Fire alarm permit work okay for final status.
FIR12-00211 INSP-Final Inspection5/3/20125/4/20125/4/2012 12:09:10 PMAPASS
Rough-in and final inspections passed-
FIR12-00164 INSP-Final Inspection5/4/20125/4/20125/4/2012 12:06:28 PMPPASS
Inspection completed satisfactory. Permit finaled.
FIR12-00164 INSP-Sprinkler Rough-in/Hydro5/3/20125/4/20125/4/2012 12:04:41 PMAPART
Inspection intended for fire alarm test and final.
FIR12-00115 INSP-Final Inspection5/3/20125/4/20125/4/2012 12:03:12 PMAPASS
Fire alarm permit work approved for final.
FIR12-00100 INSP-Final Inspection5/3/20125/4/20125/4/2012 12:02:18 PMAPASS
Inspection passed. Fire alarm permit finaled.
FIR12-00155 INSP-Final Inspection5/3/20125/4/20125/4/2012 11:57:43 AMAPASS
Field verified noted conditions for final have been met. Fire sprinkler permit finaled.